Characterization Of Loess For Deep FoundationsBy Robert L. Parsons
This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet
Jan 1, 2009
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Experiences With Heavy Drop Hammer Testing Of Rock-Socketed ShaftsBy Frank Rausche
Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust
Jan 1, 2006
-
A New Low-Cost Bi-Directional Load Test Technique for Drilled ShaftsBy Sherif Elfass, Gary Norris
Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s
Sep 8, 2021
-
Piling Practice in Sedimentary Granular Soils of Santa Cruz, BoliviaBy Mario Terceros H, Bengt H. Fellenius
"ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su
Jan 1, 2014
-
Ground Vibrations from Pile and Sheet Pile Driving Part 1 — Building DamageBy K. Rainer Massarsch, Bengt H. Fellenius
"Abstract Vibrations generated during the driving of piles or sheet piles can affect buildings or installations in the ground. However, observed building damage is not always caused directly by dynami
Jan 1, 2014
-
Measured And Predicted Response Of Laterally Loaded Piles - SynopsisBy K. Mallikarjuna Rao
There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction
Jan 1, 1996
-
Jet Grouting for Echo Dam Seismic RehabilitationBy Tara Schenk-McFarland, Mark Bliss
Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s
Jan 1, 2017
-
Current State of Practice of Corrosion Protection in Europe with Hollow Bars - Comparison to Methods Being used in North AmericaBy Alice Y. Tseng, Dan MacLean
"Corrosion protection of all deep foundation systems made of steel is THE issue when considering durability of the element in the long term. Protecting steel from corrosion and maintaining the steel t
Jan 1, 2017
-
Tied-Down Boat Section ConstructionBy Romano J. Micciche
One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High
Jan 1, 1994
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And CommunicationBy Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Strain Gauge Interpretation Using Automated Collection Systems and the Accuracy of Using Extrapolated Modulus vs Constant Modulus of a Pile, Along With the Importance of a Detailed QA/QC ProgramBy Michael A. McNicholas
"Deep foundations utilize the varying soil conditions to provide the most cost-effective or practical scope for a given jobsite. Once the scope has been determined and the engineering applied, the ele
Jan 1, 2017
-
Screening Tool for Impact Hammer SelectionBy Gerald Verbeek, David Tara
"When selecting an impact hammer to drive a particular pile, the decision is often based on local experience. In those cases, the contractor falls back on previous experience or draws on the experienc
Jan 1, 2017
-
Foundation Retrofit Design and Construction for the Benicia-Martinez Bridge, Martinez, California - 1998 DFI Annual Conference October 7th-9th, 1998 Seattle, WashingtonBy Roy A. Imbsen
Following the 1989 Loma Prieta earthquake, California Department of Transportation (Caltrans) expedited an effort to evaluate and retrofit important state-owned toll bridges to enhance performance of
Jan 1, 1998
-
The Channel Tunnel Project - Historical BackgroundBy C. J. Kirkland
For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains
Jan 1, 1991
-
Shaft End Bearing Capacity In Cavernous LimestoneBy Issa S. Oweis
Limestone is a sedimentary rock composed primarily of calcite (calcium carbonate). In the presence of an aqueous solution of carbon dioxide (carbonic acid) bicarbonate radicals (2HCO3)- are produced t
Jan 1, 2009
-
Installation And Testing Of Instrumented Tieback Anchors - IntroductionBy Joan Stoupa
The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili
Jan 1, 1990
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. IntroductionBy John Lemke
Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin
Jan 1, 2002