    2013 OPA Winner: Wolf Creek Dam Rehabilitation

    By Fabio Santillan, Michael F. Zoccola

    "Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone

    Jan 1, 2013

  • DFI
    Minipiles And Jet-Grouting: A Strong Foundation In Parma, Italy

    By Bruno Gemmi

    The objective of the ? 200 million ($280 million) project Parma Railways Station-Urban Transformation was the reconnection of the North and South parts of the town by constructing an 80 m (250 ft) wid

    Jan 1, 2011

  • DFI
    New Concepts For CFA (Auger Cast) Pile Controle - Synopsis

    By Shachar Magali

    This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique

    Jan 1, 2000

  • DFI
    Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations

    By Marlion T. McQuinn

    This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys

    Jan 1, 2006

  • DFI
    Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002

    By Colin Curtis

    The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an

    Jan 1, 2002

  • DFI
    Constructability Of Tiedback Wall Systems - I. Introduction

    By Thomas C. Anderson

    Tiedback walls are now recognized and accepted as a good solution for a variety of structural problems: ? Retaining Walls and Bridge Abutments in cut situations ? Landslide stabilization ? Rep

    Jan 1, 1991

  • DFI
    Drilled Shaft Foundations For The Float-In Dam On The Monongahela River At Braddock, Pa

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative ?In-the-Wet? technology. A key feature of this technology involv

    Jan 1, 2013

  • DFI
    Lateral Response of Pole on Engineered Driven Timber Pile Footing at Ararat Windfarm Terminal Station

    By Frank Albrecht, Brian McCarthy

    "The Ararat Terminal Station (ARTS) is located 190km to the north-west of Melbourne, approximately 1.7km to the north of Elmhurst Township in the Pyrenees region of western Victoria, Australia. The si

    Jan 1, 1900

  • DFI
    Interaction Between New Drilled Shafts And Existing Timber Piles At Holland Tunnel Approach

    By Aly M. Mohammad

    The 12th and 14th Street Viaducts, which carry Route 139, are located west of the Holland Tunnel in Jersey City, New Jersey. The two viaducts, provide access to and from the Holland Tunnel (which con

    Jan 1, 2009

  • DFI
    Converse Probabilistic Analysis And Testing In Situ For Bed Rock Under Pile With Large Diameter

    By Peng Jiahong

    With ultrasonics application during checking the large diameter cast-in-situ pile body, it is usualy applied the statistical method of probability and PSD. This paper presents a converse probabilistic

    Jan 1, 1991

  • DFI
    Effect Of Installation On Quality Of Deep Mixed Soil Cement Columns

    By Ali Porbaha

    Rapid growth in the urban development requires continuous search for innovative technologies to construct complex infrastructure systems. Deep mixing is one promising construction technology that has

    Jan 1, 2001

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne Interchange

    By Travis Coleman, Elvis Ishimwe

    Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • DFI
    Geotextile Encased Columns (GEC) as Pile-Similar Foundation Elements: Basics, Specifics, Case Studies

    By Marc Raithel, Sven Schröer, Lilma Schimmel, Dimiter Alexiew

    "The Geotextile Encased Columns (GEC) deep foundation system for embankments and dikes on soft soils was introduced some 20 years ago and is now considered State-of-the-art in Germany, Europe and, ste

    Jan 1, 2017

  • DFI
    Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire

    By J. A. Elliot

    Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou

    Jan 1, 1989

  • DFI
    A Review On Pedestal Piles

    By Venkatesh S. V J, Shubha M, Srilakshmi G

    Choosing for the best option of pile foundations to overcome large lateral and uplift loads for the foundations in transmission line towers/offshore environment is still being a concern to achieve the

    Sep 1, 2022

  • DFI
    Use Of Controlled Modulus Columns In Retail & Industrial Development Projects

    By Frederic Masse

    With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f

    Jan 1, 2011

  • DFI
    Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction

    By Aaron Evans, Chu E. Ho, Tom Richards

    "This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet

    Jan 1, 2016

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994