    Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train Loading

    By Pratik Goel, Sumanta Haldar

    High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera

    Sep 1, 2022

  • DFI
    Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression Tests

    By Padmavathi V, M. Najamuddin, M. R. Madhav

    Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation

    Sep 1, 2022

  • DFI
    Soil Displacement Caused By Pile Driving In Clay

    By K. Rainer Massarsch

    The effects of soil displacement caused by pile driving on adjacent piles and structures are discussed. A method is proposed to estimate the point of force equilibrium which makes it possible to calcu

    Jan 1, 1989

  • DFI
    Driving And Testing Of 75 M Long H-Piles In Shanghai - 1 . Synopsis

    By Lucien Weber

    In the Shanghai area, the soil conditions are such that bearing piles have become an essential foundation part of the new highrise buildings. In order to reduce the settlements under the high working

    Jan 1, 1987

  • DFI
    Pile Load Tests

    Case I- Timber Pile Test- 4 pages describe the pile driving record, the pile load test and the boring log. Case II- 24 inch square prestressed concrete pile-5 pages give details about the pile dri

    Jan 1, 1988

  • DFI
    Foundation Design And Construction In Variable Rock

    By Joel Moskowitz

    A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be

    Jan 1, 2002

  • DFI
    Hand-Dug Underreamed Piles At Embankment Place, London

    By W. J. Grose

    The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th

    Jan 1, 1989

  • DFI
    A Case Study, Design Change from Spread Footing to Drilled Shafts

    By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal

    "This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi

    Jan 1, 2016

  • DFI
    History And Present Status Of Piles And Their Installation In The United States - Expanded From A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982

    By Hal W. Hunt

    Steel and concrete piles and power-actuated hammers have developed almost entirely within the past 100 years. Prior to that time, piles were mostly timber, driven with a drop hammer or a maul. The Eng

    Jan 1, 1984

  • DFI
    Helical Pulldown? Micropiles Support Museum Celebrating The Bicentennial Of The Lewis And Clark Expedition

    By Roy Jennings

    The Discovery Expedition of St. Charles, MO chose to build its two-story museum in the flood plain of the Missouri River, near the starting point of the Lewis and Clark Expedition. Should the lower le

    Jan 1, 2003

  • DFI
    Helical Piles With Grouted Shafts - A Practical Overview

    By Gary L. Seider

    Helical screw piles are used in various applications including the underpinning of distressed foundations and as deep foundations for new structures. At present, maximum design loads range between 12.

    Jan 1, 2003

  • DFI
    Cofferdam Failures ? Introduction

    By Richard J. Hartman

    This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p

    Jan 1, 1987

  • DFI
    Maturation of Risk Concepts in the Management of Infrastructure - Lessons from the US Army Corps of Engineers

    By Eric C. Halpin

    "1. Introduction and Backgrounda. In its fundamental form, risk is simply the likelihood of an adverse impact. Expanding on this theme, the Corps of Engineers has broadly defined risk associated with

    Jan 1, 2014

  • DFI
    Deep Compaction Of Saturated Loess By Means Of Sand-Gravel Piles ? Synopsis

    By Z. G. Lin

    In Xian, China, compaction by means of soil (or lime-soil) piles is one of the effective methods widely used for densifying loess and eliminating its collapsibility. However, as a result of groundwate

    Jan 1, 2010

  • DFI
    Anchored Pile Foundations In British Columbia

    By Cory J. E. Yacyshyn

    Anchored steel pipe piles are being used more frequently in British Columbia for shoreline projects such as public ferries, cruise ship docks, containership terminals and locally in the expansion of t

    Jan 1, 2004

  • DFI
    Numerical Study On Uplift Capacity Of Helical Pile Embedded In Clay

    By Muttharam M, Karthick Kumar V

    Helical piles foundation systems have been extensively used in engineering application. It is commonly adopted to resist the compression, uplift force, overturning moment and lateral forces. Helical p

    Nov 1, 2022

  • DFI
    Rock Socketed Drilled Shafts in Electrical Substations

    By Brock Wallis, Steve Davidow

    The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses

    Jan 1, 2018

  • DFI
    Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure

    By Damian R. Siebert

    Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation

    Jan 1, 2011

  • DFI
    Getting Paid In Hard Times - I. Formation Of The Contract

    By Dennis J. Riley

    A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter

    Jan 1, 1991

  • DFI
    Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment

    By Thomas M. Caruso

    Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,

    Jan 1, 2008