Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • DFI
    Improvements In Deep Compaction Using Vibratory Pile Hammers

    By Dennis Nottingham

    Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971 L.B. Foster Company perso

    Jan 1, 2004

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    The Monroe St. Viaduct: A Case History Of MSE Vibro-Concrete Column Supported Embankment

    By Paul J. Lewis

    Replacement of the Monroe Street Viaduct in southwest Baltimore City, Maryland included transforming 240 feet of the south approach from a pile-supported multi-span bridge to a mechanically stabilized

    Jan 1, 2007

  • DFI
    Auger-Cast Piles Founded In Compressible Bearing Stratum

    By Alfred H. Brand

    New York City contains extensive deep deposits of glacial lake varved silt and clay, often overlain by organic soil. An 18 story building was proposed for Manhattan's upper East Side in one such

    Jan 1, 2003

  • DFI
    High Capacity Piles In The Hamilton Bayfront Area

    By C. D. Thompson

    Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad

    Jan 1, 1987

  • DFI
    When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 Broadway

    By Edward J. McNamara

    People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the

    Jan 1, 2000

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • DFI
    Theoretical Examination of Initially Bent Piles

    By Janne P. Isohaka, Anssi M. Laaksonen

    "Abstract In Scandinavia the use of steel pipe piles in bridge foundations started in the mid-1980s and has increased steadily since. As the piles driven in soft soils are slender, they can fail by bu

    Jan 1, 2014

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    Quality Control Of Augered Cast-In-Place And Displacement Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is

    Jan 1, 2002

  • DFI
    Complex Piling Works At London Blackfriars Station

    By Jamie D. McEwan

    To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui

    Jan 1, 2011

  • DFI
    Influence Of Urbanization And Geology On Deep Foundation Design And Construction

    By Hiren J. Shah

    The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his

    Jan 1, 2011

  • DFI
    Base Grouted Piles - Mr. P. M Cashman, Independent Consultant

    By W. J. Kingwell

    My comments and questions are addressed to Mr. Troughton. It seems to me that the tests were very well tailored to determine long term effects on performance of bearing piles as groundwater pressures

    Jan 1, 1991

  • DFI
    Design Of Drilled Pier In Expansive Soils

    By G. T. Hong

    A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p

    Jan 1, 2007

  • DFI
    Stabilization of an Existing Cellular Tower Foundation by Installing Jet Grouted Piles

    By David T. Farber

    "Stabilization of an existing cellular tower foundation system without dismantling the tower or compromising the existing foundation system was accomplished by installation of a jet grouted pile syste

    Jan 1, 2005

  • DFI
    Pile Load Test Results Using The New Statnamic Method

    By Matthew Janes

    Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa

    Jan 1, 1990

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007

  • DFI
    Diaphragm Walls Acting As Anchor Curtains Of Laterally Loaded Structures - Synopsis

    By J. Matos e Silva

    The paper refers two examples of structures located in seismic areas (Cases 1 and 2). The first one (Case 1) is the Torroal Bridge, located about 100 Km South of Lisbon, in the road Troia-Grandola

    Jan 1, 1996