Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Innovative Alternate Underpinning Solution for Historic Structure in Boston SuburbBy Eric P. Bregman, Justin Zarrella, Ryan M. Coulson, Connor Johnson
Within a prominent Boston, MA suburb are a pair of historic stone and mortar structures built in the late 1800’s. Both the Main House and Carriage House have been maintained and occupied throughout th
Sep 8, 2021
-
What It Takes (Geostructurally) To Extend The Plane Train Tunnel Under The World'S Busiest AirportBy Ryan T. Smith, Anthony Sahj, Alexander T. Darnell
Every second can count when trying to board a departing flight or catch a ride-share to your final destination. Hartsfield-Jackson Atlanta International Airport is in the midst of a project that aims
Oct 1, 2022
-
Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) WallBy Pancho J. Garza, Keith H. Dahlen, Chris A. Labye
"Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta
Jan 1, 2015
-
Correlation between Undrained Shear Strength in Dry Deep Mixing Columns and Unimproved Soft SoilBy Stefan Larsson, Jan Ekström, Jennie Kock-Larsen, Håkan Garin
"This paper describes the testing procedure (or protocols) for quality control of dry deep mixing columns in a major ground improvement project carried out in Sweden. Quality control was mainly based
Jan 1, 2015
-
New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable SoilsBy Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain
"An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i
Jan 1, 2015
-
Soil-Cement Columns For Building FoundationsBy Osamu Taki
The development of new auger bits for soil cement column drilling equipment has made it possible to create a homogeneous mixture of soil and cement-reagent slurry. As a result, soil-cement columns are
Jan 1, 1992
-
Field and Laboratory Mix Trials for a Deep Soil/Cement/Bentonite Cut-Off Wall Using CSM EquipmentBy Russell J. Denny
"A 25m deep cut-off wall is required for environmental remediation of a Former Chlor-Alkali Plant. Extensive trials were conducted to verify the effectiveness of the mixes proposed, with the requireme
Jan 1, 2015
-
Westlink Projects – Geotechnical Challenges During The Execution PhaseBy Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Route 9A Pedestrian Tunnel at the World Trade CenterBy Raymond E. Sandiford
"The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit
Jan 1, 2012
-
Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power FacilityBy David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar
"With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil
Jan 1, 2016
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017
-
The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off WallsBy Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf
"Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa
Jan 1, 2005
-
Impact Of Offshore Site Investigation Practice On Reliability Of Axial Pile Design In Siliceous SandsBy James A. Schneider
The evolution of the American Petroleum Institute (API) design method for axial capacity of driven piles in siliceous sands is explored, and complemented with an overview of how changes in offshore si
Jan 1, 2006
-
Marine Prefabricated Vertical Drains For The Craney Island Eastward ExpansionBy Ira Brotman
The Virginia Port Authority and the U.S. Army Corps of Engineers are partnering to construct the Craney Island Eastward Expansion (CIEE) to meet the dual purpose of extending the life of Craney Island
-
After Sandy: Bay Park Sewage Treatment Plant Flood ProtectionBy David Guy, John Stanbury, Gilbert Tallard
"In 2009, storm surge from Hurricane Sandy inundated the Bay Park Sewage Treatment Plant located at El. +4 to +12 (+1.2 to +3.6 m) in East Rockaway, Long Island, NY. With all systems down, raw sewage
Jan 1, 2016
-
Installation Parameters, Pile Performance and Importance of TestingBy Maurice Bottiau
"Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co
Jan 1, 2014
-
LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) TestBy Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles
"This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te
Jan 1, 2017
-
Load Tests on Drilled Shafts at Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft
Jan 1, 2016
-
The Deep Cut-Off at the Walter F. George Dam"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow