Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen
"As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced
Jan 1, 2017
-
Thermal Integrity Profiling Of Drilled ShaftsBy Gray Mullins
The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo
Jan 1, 2010
-
Experiences From The Italian High Speed Rail Network AV ConstructionBy Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
"Renovation Of The Amsterdam Concert Hall, Replacing 2000 Wooden Piles By 400 Vibration-Free Tubex Piles In Restricted Room."By Alexander J. Verstraeten
Work started on the building of the Amsterdam Concert Hall in 1880 by driving over 2000 wooden piles of 13 m on which foundation-beams out of wood and brickwork were made. During construction the de
Jan 1, 1987
-
Experiences And New Developments In Offshore FoundationBy Franz-Werner Gerressen
As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
Sheikh Jaber Al-Ahmad Causeway Project in Kuwait - A Case StudyBy Paolo Cavalcoli, Federico Pagliacci, Marco Chiarabelli
"The Sheikh Jaber Al-Ahmad Causeway Project in Kuwait is estimated at approximately $US3.7 billion and consists of constructing a causeway across the Kuwait Bay, connecting the Shuwaikh Port with the
Jan 1, 2016
-
Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble DepositsBy Marco Fellin, Van E. Komurka
Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.
Jan 1, 2019
-
Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge RehabilitationBy Jeffrey R. Hill
To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a
Jan 1, 2006
-
Dynamic and Static Load Tests on Tapered Piles in Soils Exhibiting Time-Dependent Capacity GainBy Terrence M. Carroll, Chu E. Ho
"A pile installation and load testing program on driven tapered piles was undertaken at John F. Kennedy International Airport in New York City for the extension of the existing Terminal 4. As part of
Jan 1, 2015
-
CFA Secant Piling In CaliforniaBy Philip Derbyshire, Dale J. Scheffler
"Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form
Jan 1, 2005
-
Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, TurkeyBy Carlandrea Albonico, Salvatore Miranda
The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc
Nov 1, 2022
-
JFKIA - Post Grouted Drilled Shafts And Driven Piles - Update - SynopsisBy Walter G. Brusey
This paper describes a comprehensive pile test program conducted at John F. Kennedy International Airport (JFKIA) to evaluate pile types and design capacities ranging from 890 to 4450 KN (100 to 500 t
Jan 1, 2000
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) WallBy Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
PSC Piles Overcome Challenges for $650m Power PlantBy Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
Jobsite Safety Inspection ChecklistBy Sam Messina
[Project: Job Number: Date: Superintendent: Person Making Inspection: Note: The following checklist shall be used on a regular basis as an overall assessment of the jobsite. The checklist
Jan 1, 1998
-
Helical Piers/ Anchors in the Chicago Building CodeBy Gary L. Seider, Dana A. Wesolek, Fred C. Schmednecht
"A new condominium project, The Atelier, developed by Pickus Companies located at the corner of Bryn Mawr and Sheridan in Chicago, IL required an earth retention system to protect the surrounding road
Jan 1, 2005
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
Deep Bored Piling in Soft Soil and High Lateral LoadsBy W. Sondermann
"AbstractThe construction of a distribution centre of minerals for a global mining and resources cooperation demanded the control of deformations and displacement of the stack reclaimer facilities on
Jan 1, 2014