Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Interpretation and Evaluation of Thermal Integrity Profiling MeasurementsBy Seth Robertson, Daniel Belardo, Travis Coleman
Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust
Sep 8, 2021
-
Risk Assessment and Quality Control on Grouted Waterretaining Layers by Observational EngineeringBy Bartho J. Admiraal
"As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht River. The A1 consists of 12 lanes and the total width
Jan 1, 2016
-
Safety And Economics Of Working Platforms – A Uk PerspectiveBy David Corke
The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra
May 1, 2022
-
San Francisco-Oakland Bay Bridge: OPA WinnerBy Gerry Houlahan
"The 2015 Outstanding Project Award (OPA), which recognizes the superior work of DFI members, was awarded for the San Francisco- Oakland Bay Bridge New East Span. The award was presented to representa
Jan 1, 2015
-
Design And Construction Of Shear Pins For Landslide StabilizationBy Fei-chiu Huang
A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv
Jan 1, 2010
-
Philadelphia Dock Story—Pile Challenges at Delaware RiverBy Craig H. Olson
"A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at
Jan 1, 2008
-
Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)By Craig H. Olson
"Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t
Jan 1, 2008
-
Machine Foundation RepairBy Scott D. Thomson
The client for this project specializes in the use of state-of-the-art technology to fabricate and assemble composites and metal-bonded structures for commercial and military aircraft programs. One of
Jan 1, 2003
-
Augered Cast-In-Place Pile Manual (Model Specification with Commentary)"Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst
Jan 1, 2016
-
Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)By Danny Déry-Chamberland, Peter Bowman, Michael Byle
"The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on
Jan 1, 2016
-
Improvements to Commonly Used Cutoff Wall SpecificationsBy Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test ResultsBy John C. Niedzielski
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Probabilistic Subsurface Characterization for Transmission Line Foundation DesignBy Neil T. Russo, Peter M. Kandaris, Jogi S. Gadok
"Assessment of subsurface data for foundation design in support of long high voltage electric transmission lines is best accomplished using a probabilistic strategy since only a small portion of struc
Jan 1, 2017
-
Construction of Large Drilled Shafts the 2nd Annual Mike O'neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
May 11, 2007
-
Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2008
-
Field Testing of Energy Piles at Virginia Tech (eec8519c-b3f5-4281-8615-91be67ef6c77)By C. Guney Olgun, Charles Elks, Sherif L. Abdelaziz, James R. Martin, Christopher Fox, Pier Luigi Iovino, Fatih Catalbas, Pierre Gouvin
"Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy
Jan 1, 2017
-
Critique of Specifications for Deep MixingBy George Filz, Peter R. Cali
"Unnecessarily restrictive specifications could be limiting the cost effectiveness of deep mixing (DM) applications and therefore limiting use of DM on projects where there are other options. Excessiv
Jan 1, 2015
-
Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)By John C. Niedzielski, A. Frances Ackerman
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l
Jan 1, 2017
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999