Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Resolution Of Prestressed Concrete Pile Splice Problems - SummaryBy David Siu
Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea
Jan 1, 1991
-
Hand-Dug Underreamed Piles At Embankment Place, LondonBy W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Challenge From Foundation Engineering To China ? SynopsisBy R. L. Xu
In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output
Jan 1, 2010
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
Ground Water Control In The Urban Environment - IntroductionBy Robert G. Lenz
Control of ground water for construction purposes is an everyday occurrence in the U.S. Thousands of pumps are in service at any given time. Most of these applications simply consist of pumping water
Jan 1, 1988
-
Crosshole Sonic Logging Versus Perimeter Sonic Logging: What Have We Learned?By Cory McElprang, Enamul Hoque, Aaron Thomas, Scott A. Jacobs
Crosshole Sonic Logging (CSL) only evaluates concrete on the inside of reinforcing cages leaving the outside unevaluated unless other types of testing are performed such as Perimeter Sonic Logging (PS
Jan 1, 2019
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Anchored Pile Foundations In British ColumbiaBy Cory J. E. Yacyshyn
Anchored steel pipe piles are being used more frequently in British Columbia for shoreline projects such as public ferries, cruise ship docks, containership terminals and locally in the expansion of t
Jan 1, 2004
-
Assessing the Bearing Capacity of Existing Wood Pile FoundationsBy Almer E. C. van der Stoel
"Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e
Jan 1, 2014
-
Drilled Pile Design and Installation Challenges in an Urban EnvironmentBy Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran
This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment
Jan 1, 2018
-
Determination Of Thermal Conductivity Of Coarse-Grained SoilsBy Madhu. P, Srinivas. K
Measurement of thermal properties like thermal conductivity, thermal resistivity, heat capacity and thermal diffusivity for materials, it plays a crucial role in a wide range of various civil and elec
Sep 1, 2022
-
Influence of Different Parameters on the Behavior of Laterally Loaded Piles in SandBy Musbah A. Hasan, Ahmed M. Nasr, Fauzi Jarushi
Many transmission towers, high-rise buildings and bridges are supported by piles. These structures may be subjected to large lateral loads. Therefore, experimental investigations on model piles under
Jan 1, 2017
-
Foundation Rehabilitation of the Henry Hudson BridgeBy Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel
Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe
Sep 8, 2021
-
Assessment Of Impacts And Challenges Of Existing Codes Of The Bi-Directional Static Load Test (Bdslt)By Danielle Nhanqulumanga, Pranith Bhatt, Snehal Patel, Khadeeja Priyan
The Bi-Directional Static Load Test (BDSLT) is a test that determines the capacity of piles when loaded under bi-axial static compression. In recent years the BDSLT has seen an increase in demand due
Sep 1, 2022
-
Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, MalaysiaBy Vijayakumar Viramuthu, Martin Heinrich
Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T
May 1, 2022
-
Engineering The Mansion's HeritageBy Ken MacLeod
A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi
Jan 1, 2006
-
Monitoring Auger Cast In Place Pile Construction And Testing In Hard ClayBy C. Vipulanandan
Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing
-
Advancing Severe Flood-Related Engineering KnowledgeBy Anne Lemnitzer
When a major storm system stalled over Western Europe last summer, it pro- duced the deadliest flood on European territory in the last two decades. Beyond record-setting rainfall over countries such
Feb 1, 2022
-
Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - SynopsisBy D. K. ] [Gupta
The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and
Jan 1, 1996