    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)

    By Tracy Brettmann

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2001

  • DFI
    Construction And Instrumentation Of A Deep Foundation ? Synopsis

    By Y. K. Wong

    This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment

    Jan 1, 2010

  • DFI
    Sand Compaction Piles ? Synopsis

    By A. Holeyman

    The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ

    Jan 1, 2010

  • DFI
  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    Present To Future Design Considerations Of Deep Foundations ? 1. Introduction

    By William S. Gardner

    It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac

    Jan 1, 1991

  • DFI
    Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction

    By Jon H. Gould

    This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub

    Jan 1, 1992

  • DFI
    The Realities Of Foundation Engineering ? Synopsis

    By J. O. Osterberg

    The realities of foundation enginering are that the work never proceeds exactly as expected. The various reasons, exploration, design, construction, and legal are discussed. Case histories are present

    Jan 1, 2010

  • DFI
    The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;

    By Robert A. Field

    Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t

    Jan 1, 1997

  • DFI
    Case Histories Of Geo-Column? Foundations - Synopsis

    By Osamu Taki

    This paper presents the system, the strength of column, the design concept, and the applications with four case histories from the past project as the general aspect of Geo-Column (trade mark of singl

    Jan 1, 2000

  • DFI
    Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?

    By Bernard Hertlein

    ¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser

    Jan 1, 2001

  • DFI
    Three Case Histories Comparing Impact And Vibratory Driven Pile Resistances In Marl

    By Gregory J. Canivan

    Three test pile programs were conducted in Charleston, South Carolina to evaluate differences in bearing resistance due to installation methods. The tested piles were installed with impact hammers and

    Jan 1, 2002

  • DFI
    Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary

    By John L. White

    Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to

    Jan 1, 1997

  • DFI
    CPT - Guided Installation Of Pressure-Grouted Displacement Piles

    By Mark M. Petersen

    As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven

    Jan 1, 2002

  • DFI
    Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - Synopsis

    By Yvone Franco Crosato

    The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat

    Jan 1, 2000

  • DFI
    Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting

    By Peter J. Nicholson

    A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th

    Jan 1, 1998

  • DFI
    Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • DFI
    Technical Visit

    By the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST

    Jan 1, 1994

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant