Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Laterally Loaded Caissons for Ontario College of Art & Design

    By William F. Starke

    "The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o

    Jan 1, 2004

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • DFI
    Deep Foundation Support for the Iconic New York Wheel

    By Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran

    "This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor

    Jan 1, 2016

  • DFI
    Cyclic Degradation Of Pile Foundations For Offshore Wind Turbines

    By Fabian Kirsch

    Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load

    Jan 1, 2011

  • DFI
    Single Pile Settlement Prediction And Analysis For Driven Piles

    By David R. Beadman

    The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid

    Jan 1, 2006

  • DFI
    New Possibilities for Quality Assurance of Diaphragm Wall Joints

    By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider

    "Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc

    Jan 1, 2014

  • DFI
    Implant Foundations – Press-in Piling Method for Urban Construction

    By Tsunenobu Nozaki

    "Basically, the “Press-in Piling Method” was invented to eliminate construction nuisances, such as noise and vibration which have been serious unsolved problems for advancing societies over a long tim

    Jan 1, 2015

  • DFI
    Foundation in Simsima Lime Stone for an Underground Reservoir

    By Chandramohan P. V., Ravi Kishore

    "An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d

    Jan 1, 2017

  • DFI
    Flood Protection System for Infrastructures: Methodology and Instrumentation Testing

    By Gisele R. Passalacqua, Taylor Malangone, Subhash Mahali

    New York City is a busy metropolis with 8 million people. New York has the largest public transportation system with 6 million riders a day throughout the subway system. Keeping this infrastructure in

    Sep 8, 2021

  • DFI
    Study Of Hammer Selection For Driven Steel Pipe Pile

    By Jiwei Duan

    The energy transferred from a hammer to the pile top is considered as the effective energy in this paper. The effective energy is related to the pile dimensions, soil and pile-soil interface propertie

    Jan 1, 2006

  • DFI
    Large Diameter Steel Tubular Piles For Optimum Seismic Performance

    By Ben C. Gerwick

    Large diameter steel tubular piles installed vertically or on a slight rake, offer many advantages as the foundations of major overwater bridge in regions of high seismicity. By proper selection of di

    Jan 1, 2013

  • DFI
    A Soil Quake Davisson Offset Method For Drilled Foundations

    By Michael Perlow Jr

    A modification of the original Davisson Offset Limit (DOL) is presented for drilled foundations using soil quake (QDOL) factors ranging from 2 to 6. A further modification of the Davisson Offset Limit

  • DFI
    Foundations For The M25 Motorway Near To Heathrow Airport

    By John F. Spence

    Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne

    Jan 1, 2007

  • DFI
    Information Construction Technology For Supported Excavation In Urban Construction

    By Sun Jiale

    This paper presents a brief description of information construction technology for supported excavation to assure satisfactory performance of engineered system. As a successful example of application

    Jan 1, 1991

  • DFI
    Detailing For Cast-In-Place Pile-Column Ductility ? Introduction

    By Andrew Budek

    Reinforced concrete piles are used to carry foundation loads through considerable depths of soil to provide superstructure stability under gravity loads and lateral forces. The creation of cast-in

    Jan 1, 2007

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • DFI
    Drilled Shaft Foundations For The KcICON Missouri River Bridge

    By Paul J. Axtell

    The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M

    Jan 1, 2009

  • DFI
    Complex Shoring for Mixed-Use Site in U.S. Capital

    By Richard Guenther

    As available space in urban centers becomes more scarce, builders and developers are increasingly turning to vacant, existing structures to meet cities' growing needs. The developers of City Ridge Roa

    Feb 1, 2022

  • DFI
    Cooling Water Intake Shafts for the Oak Creek Expansion

    By Edward Jacobsen, Patrick J. Lydon

    "The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake

    Jan 1, 2008

  • DFI
    Site Solutions For The Pisa Tower Remediation - 1 - Introduction

    By Paolo Heiniger

    The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter

    Jan 1, 2000