Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Doyle Drive – Extreme Pile InstallationBy Peter Faust
"The south access road to San Francisco’s Golden Gate Bridge, known as Doyle Drive or Presidio Parkway, needs to be replaced. Built in 1936, it is the primary highway and transit linkage through San F
Jan 1, 2012
-
Recent Experiences With Optical Fibre Monitoring Of Geotechnical StructuresBy Gust Van Lysebetten, Monika de Vos
The objectives of monitoring geotechnical structures can be very diverse, including optimisation of the design, quality control, long term performance assessment, and approval of innovative execution
May 1, 2022
-
An In-Situ Model Test For A Large Hydraulic Press Foundation ? SynopsisBy R. J. Yan
There was a plant equipped with a 32000t Hydraulic Press to be built, under which a box foundation of 22.5m x 15m x 14.25m (depth) with a base slab of, varying thickness was proposed. The subgrade rea
Jan 1, 2010
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas
-
Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On PilesBy Nien-Yin Chang
The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution
Jan 1, 2007
-
Unique Foundation Solution For The Shriners Burns Institute Building Expansion - I. IntroductionBy Edmund Cardoza
In the spring of 1993, construction began on an ambitious building project in Boston, Massachusetts. The Shriners organization committed to offer state-of-the-art adolescent burn treatment and rehabil
Jan 1, 1994
-
Non-Linear Analysis Of Large Pile Groups For The New Wembley StadiumBy S. Hardy
The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu
Jan 1, 2006
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban EnvironmentBy Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003
-
Foundations In The Urban Environment The Need For Unique Installation Methods - IntroductionBy James J. Cahill
Contractor's working in an urban environment face a multitude of working conditions. There is no typical "Downtown" job site. From afar we just see the skyline, or up close a specific building. T
Jan 1, 1991
-
USTA Geoseismic and Foundation Design ChallengesBy Athena C. Denivo, Pablo V. Lopez, Sissy Nikolaou, Alfred H. Brand, Ahmad Rahimian, Rudivien G. Josef
"The United States Tennis Association (USTA) Billie Jean King National Tennis Center (BJKNTC) site is located in the northeastern portion of the Flushing Meadows Corona Park area of Queens, N.Y. The s
Jan 1, 2015
-
Combined Piled Raft Foundation (CPRF) responseBy G. L. Sivakumar Babu, P. Chaithra
"Raft foundations which are used against differential settlements and for carrying heavy loads can still be subjected to excessive settlements even if it is safe against bearing capacity consideration
Jan 1, 2015
-
Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story StructureBy Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
DFI46 Panel on Foundation ReuseBy Andy Boeckmann
In early 2021, DFI formed a Foundation Reuse Task Force due to concurrent and coincidental discussions of this topic during meetings of the Subsurface Char- acterization for Deep Foundations and Test
Feb 1, 2022
-
Owing to an Increasing Demand to Manage Risk and Maximize Cost-Effectiveness, Preference for Reliability-Based Design (RBD) Over Traditional Deterministic Design Procedures has increased for Deep Foundation ElementsBy Armin W. Stuedlein, Seth C. Reddy
In this study, factors affecting the reliability of augered cast-in-place (ACIP) piles under axial compression at the serviceability limit state are addressed using a simple probabilistic hyperbolic m
Jan 1, 2013
-
D-Wall Extreme – Contrast Between Going Deep And Getting SmallBy Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-
May 1, 2022
-
Characteristic Features of Deep Excavations in the Metropolis and the Probable Hazards.By Sudhir Kumar Das
"The exorbitant price of the land in the metropolis has restricted the horizontal expansion and compelled the owners, the developers and the engineers to opt for vertical expansion. This has resulted
Jan 1, 2015
-
Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern ThailandBy Narong Thasnanipan
Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette me
Jan 1, 2002
-
Rammed Aggregate Pier System Provides Uplift Resistance At University Ice ArenaBy John G. DiGenova
The Allwell Center Ice Arena at Plymouth State University, Plymouth, New Hampshire is located in the flood plain of the Pemigewasset River. To maintain the arena near the level of the surrounding are
Jan 1, 2011
-
Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry PracticeBy Martin D. Larisch, Ronald Damen
The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre
May 1, 2022