Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 IntroductionBy Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Settlement Evaluation of Large Water Storage Tanks Under Challenging ConditionsBy Ben M. Lewis, Yogesh Prashar
"The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal
Jan 1, 2016
-
High Capacity Drilled Piles in BrooklynBy Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe
"The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount
Jan 1, 2016
-
Repairs Of Diaphragm Walls, Lessons LearnedBy Raymond J. Poletto
This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal
Jan 1, 2011
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? IntroductionBy Robert A. Field
Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S
Jan 1, 1995
-
Bored Piles With Base Preloading By Grouting - The Polish ExperienceBy Bolestaw A. Ktosihski
Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr
Jan 1, 2006
-
Tubex-Grout-Injected-Piles For The Parenco Paper Mill In Renkum (The Netherlands) - The Application Of Tubex-Groutinjection-Piles For The Parenco Paper Mill PM-1 In Renkum (The Netherlands)By Sikko Doornbos
For the extension of the Paper Mill of Parenco in Renkum, the Netherlands, the application of a pile foundation was required. The demands for this pile foundation were very explicit a vibration free a
Jan 1, 1987
-
D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article
Jan 1, 1989
-
A Collaborative Approach To The Design And Delivery Of The Most Heavily Loaded Piles Ever Constructed In The UkBy Morris J. D, Baldwin Z., Wiltcher P. M
21 Moorfields is an oversite development in central London spanning Moorgate tube station. It required the installation of both the highest loaded bearing piles and the highest top loaded static pile
-
Construction Of Large Underground Openings And Use Of Grouts ? SynopsisBy E. Mongilardi
The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a
Jan 1, 2010
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
Analysis and Behavior of Double Sheet Pile CofferdamBy Kamil Nuzha, Jianchao Li, Bashar S. Qubain
"The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we
Jan 1, 2016
-
Diaphragm Walls, Recent Developments to Improve ReliabilityBy A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen
"Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual
Jan 1, 2014
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
Axial Behavior Of Auger Cast Piles In Inner Coastal Plain GeologyBy Brain E. Ladd
A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
-
Integration Of Real Time Pile Design By Means Of Building Information ModelingBy Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck
The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly
May 1, 2022
-
FHWA Hollow Bar Soil Nail (HBSN) Test Program, A SummaryBy Jesús E. Gómez
Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p
Jan 1, 2011