    Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"

    By R. Paul De Bruyn

    A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.

    Jan 1, 1990

  • DFI
    Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - Synopsis

    By S. R. Nandargikar

    Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.

    Jan 1, 1996

  • DFI
    Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing Facility

    By Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler

    "This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in

    Jan 1, 2015

  • DFI
    Data Normalization and User Interface Design for the Nevada Department of Transportation Deep Foundation Load Test Database

    By Austin Metz, Kevin Stanton, Ramin Motamed

    "A recent study calibrated Load and Resistance Factor Design (LRFD) resistance factors for local soil conditions in the Las Vegas Valley. As a part of this calibration, an extensive database of drille

    Jan 1, 2017

  • DFI
    Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, Canada

    By Nadir Ansari, Brian W. Wilson, Marina S. W. Li

    "A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B

    Jan 1, 2017

  • DFI
    A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile Driving

    By H. R. Masoumi

    This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative

    Jan 1, 2006

  • DFI
    Recommendations For Implementing And Interpreting Non­Destructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.

    By Jose L. Garcia

    The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra

    Jan 1, 2006

  • DFI
    First Use In The USA Of The CSM Method For Use As Microtunnel Sending And Receiving Shafts

    By Brett K. Mainer

    In the summer and fall of 2007, Drill Tech Drilling and Shoring, Inc. designed and built three 24-foot inside diameter shafts in Northern California using soil mix panels for support. The soil mixing

    Jan 1, 2008

  • DFI
    Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case Study

    By Krishnendu Mandal

    "For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile

    Jan 1, 2015

  • DFI
    Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California

    By Lawrence P. Goldfarb

    This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg

    Jan 1, 1993

  • DFI
    Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons Learnt

    By Ziyad Abunada, David O’Connor, Abir Al-Tabbaa

    "Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental

    Jan 1, 2014

  • DFI
    Effect of Sand Density on Load Sharing Mechanism of Piled Raft Foundation

    By Rouzbeh Vakili, Adel M. Hanna

    "The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und

    Jan 1, 2017

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • DFI
    A Method For Predicting Load-Settlement Relationship And Bearing Capacity Of Single Piles By Means Of CPT

    By Wang Huichang

    A tentative mathod for predicting load-settlement relationship and bearing capacity of single piles based directly on the results measured by cone penetrometer with local friction sleeve is presented

    Jan 1, 1991

  • DFI
    The Construction And Performance Of Post-Grouted Micro-Piles For Vancouver International Airport Domestic Terminal Building - Introduction

    By Ernest Naesgaard

    Post-grouted micro-piles were used for the seismic upgrading of the Vancouver International Airport Domestic Terminal Building (DTB). The micro-piles provided vertical resistance to both uplift and c

    Jan 1, 2004

  • DFI
    Innovative Crosshole Sonic Logging Testing Drilled Shafts

    By Joshua C. Adams, Les Chernauskas, Edward L. Hajduk

    "Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car

    Jan 1, 2009

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) for Use During Drilled Shaft Construction (7493fc91-7396-4eac-bed2-0406570252cc)

    By Omer F. Usluogullari, C. Vipulanandan

    "It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increa

    Jan 1, 2017

  • DFI
    Piled-Raft Foundations in Belarus

    By V. A. Sernov

    "One of the ways to increase the bearing capacity of a piled foundation is to take into account soil resistance in the base of the raft. Piled raft is similar to shallow foundation and can transfer si

    Jan 1, 2016

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • DFI
    Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2011