Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rock Socketed Drilled Shafts for the Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of
Jan 1, 2016
-
10th International Conference On Piling And Deep Foundations: Amsterdam 2006 - Title ? Table Of Contents - Welcome Address From The Mayor Of Amsterdam, Job CohenIt is my great pleasure as mayor of the city of Amsterdam to welcome you today to Amsterdam, and to the 10th International Conference on Piling and Deep Foundations. The history of Amsterdam has b
Jan 1, 2006
-
Design of Pile Foundation for Tall Railway Bridges in North-East IndiaBy Sumantra Sengupta
"Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu
Jan 1, 2015
-
The Progress Of Jet Grouting In The Last 10 Years In Japanese MarketBy H. Yoshida
Jet grouting was first introduced in Japan in the second half of the 1960s, approaching 50 years ago. By the end of the first 40 years, jet grouting from single to triple fluid systems had become a g
Jan 1, 2010
-
Sheikh Jaber Al-Ahmad Causeway Project in Kuwait - A Case StudyBy Paolo Cavalcoli, Federico Pagliacci, Marco Chiarabelli
"The Sheikh Jaber Al-Ahmad Causeway Project in Kuwait is estimated at approximately $US3.7 billion and consists of constructing a causeway across the Kuwait Bay, connecting the Shuwaikh Port with the
Jan 1, 2016
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of MexicoBy Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee DamBy Glen R. Andersen
"Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is
Jan 1, 2017
-
Towards a Performance-Based Design of Drilled ShaftsBy Kam Ng
For bridges or buildings that may be subjected to large vertical and lateral loads, drilled shafts offer an economic foundation solution. While the current drilled shaft design practice is considered
Jan 1, 2013
-
Indicator Pile Program at Port of Oakland, CaliforniaBy Partha Sircar
"For Berth 22 modifications at the Port of Oakland, nearly 600 octagonal 24-inch ‘diameter’ precast-prestressed concrete piles were driven, some piles over 160 feet long. Prior to production pile driv
Jan 1, 2015
-
High-Capacity Helical Piles for Drill Trestle SupportBy Matt Fenwick, Douglas R. Schwarm
Stringent underwater noise limits at the Fairview Ave. N. bridge replacement on Seattle's Lake Union required an innovative approach to supporting the 470-ft long drill trestle. Screw-in foundations
Sep 8, 2021
-
Outline and Execution Control System of Dry Jet Mixing (DJM) MethodBy Shigetoyo Yasui, Masahiro Saitou, Nobushige Yasuoka, Keisuke Tsujimoto
"The Dry Jet Mixing (DJM) Method was developed and has been put to practical use on the initiative of the Public Works Research Institute and Japan Construction Method and Machinery Research Institute
Jan 1, 2015
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Comparative Analysis Between Traditional And EC7 Criteria Applied To The Design Of Diaphragm Walls Concerning The Ultimate Limit StatesBy J. Matos e Silva
The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditional crit
Jan 1, 2002
-
UB Digs Deep and Builds Over Adjacent Subway for New Medical Building HubBy Lisa R. Papandrea, David Chen, Walter E. Kaeck
"Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su
Jan 1, 2016
-
Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast LoadsBy John Mould, Gordon Chen, Michael Oakland, William McElwee
"This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
Jan 1, 2017
-
LRFD and Its Implications for QC/QA of Deep FoundationsBy Bernard Hertlein, Chia K. Tan
"The move to LRFD methods for structural design by AASHTO, ACI, AISC , ASCE, and the FHWA has been a major change for the American construction industry. The deep foundations industry has arguably bee
Jan 1, 2005
-
State Of The Practice In Florida On Deep Foundation Installationinduced Ground Deformations And VibrationsBy Boo Hyun Nam, Berk Turkel, Luis G. Arboleda-Monsalve, Jorge E. Orozco-Herrera
Construction of buildings, roads, and traffic activities generate vibrations to urban infrastructure. The vibrations produced by construction activities have an impact on the soil through which they a
Oct 1, 2022
-
Full Scale Uplift Load Testing of Micropiles in Cohessionless SoilBy M. Hesham El Naggar, Maged A. Abdlrahem
"Hollow bar micropiles have constructional advantages such as: fast and low-noise and low vibration installation process and small installation equipment, which allow access to tight places. In additi
Jan 1, 2016
-
Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design ParametersBy Martin D. Larisch
The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.
Nov 1, 2022
-
Metro Sao Paulo, Line 5, Five Shaft Diaphragm Wall for Brooklin StationBy Dario Libano, Franz-Werner Gerressen
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. Of course they can also be used as deep groundwater barrie
Jan 1, 2017