Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Axial Cyclic Degradation of Marine Piles: A Strain-Based Fatigue LimitBy Aaron S. Bradshaw, Ryan M. Coulson
The offshore wind industry in the United States is slowly emerging with the recent construction of the first offshore wind farm located off the coast of Rhode Island. The turbines at the Block Island
Jan 1, 2018
-
Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, CaliforniaBy Zia Zafir
"Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d
Jan 1, 2016
-
Session 13 "Jet Grouting III"By Peter Iovino
Unfortunately, I don't know the unit cost per cubic yard of treatment. I reflected on that yesterday and I don't think that we considered the use of micropiles. They could have been an optio
Feb 10, 2003
-
Smart Soil Improvement: The Use of Rigid Inclusions for Soil ConsolidationBy Federico Pagliacci, Claudio Asioli, Marco Chiarabelli
"""Rigid inclusions"" are a consolidation method that provides improvement of soft soils thanks to the installation of cylindrical columns made up of a material with significant and permanent cohesive
Jan 1, 2017
-
Piled Rafts In Geotechnical Practice - An International PerspectiveBy Michael W. Neill, O&apos
The performance of foundations that combine the high bearing capacity of rafts (mats) with the settlement reduction capability of piles is described through a summary of 24 case histories. Structures
Jan 1, 2003
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile DesignBy Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
Bearing Capacity of Post Grouted Drilled Shafts Using a Load Transfer ApproachBy Miguel E. Ruiz, America L. Fernandez, Miguel A. Pandon
"Post-grouted drilled shafts (PGS) are a deep foundation system in which grout is injected at high pressure throughout the tip after the drilled shaft has been installed. Pressure grouting of drilled
Jan 1, 2005
-
The Berkeley Art Museum: Using Deep Foundations to Repurpose a Historical BuildingBy Timothy Nelson, Simon Burnworth
"The University of California’s new Berkeley Art Museum and Pacific Film Archive will showcase a collection of art and film in a facility that pairs an existing 1930s-era printing press facility with
Jan 1, 2017
-
A Comparison Of Static And Statnamic Load Tests In Sand: A Case Study Of The Bayou Chico Bridge In Pensacola, Florida ? SummaryBy Michael D. Justason
This paper details the static and Statnamic load testing on a 600 mm square pre-stressed concrete pile. The pile was located at Pier 15 on the 20 million-dollar Bayou Chico Bridge Project in Pensacola
Jan 1, 1997
-
Value Engineering Through Systematic Site Investigation and Design Optimization – A Case StudyBy Lu Yitan, Frances Badelow, Manish Tiwari
"Large ‘design and construct’ projects often present significant geotechnical risks. However, these also present significant opportunities for value engineering in design. These opportunities can be r
Jan 1, 1900
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
A New Data Interpretation Approach For Pile Thermal Integrity TestingBy Quanchen Sun, Mohammed Z. E. B. Elsahife, Anthony Fisher, Chris Barker, Jennifer Schooling
A review of the literature shows that pile integrity is a significant concern in pile construction. Recently, a new integrity test, thermal integrity profiling (TIP,) has been put into use in foundati
May 1, 2022
-
The Use of Shape Accel Arrays (SAAS) for Measuring Retaining Wall DeflectionBy Paul Thurlow, Richard K. Lipscombe
The measurement of deflection of designed diaphragm walls is critical for near real time information to assess wall and soil behaviour as the internal area is excavated in a controlled manner. Data en
Jan 1, 2017
-
Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet PilesBy Norm Kirk, Robert Bittner
"The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca
Jan 1, 2017
-
Pullout Capacity of Pile Groups in SandBy S. P. Mukherjee, Smita Tung
"Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i
Jan 1, 2015
-
Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge ProjectBy Gray Mullins
A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade
Jan 1, 2003
-
Excavation Risks Adjacent to Existing Structures in Illinois and Urban Environments - Identifying and Managing Technical and Legal IssuesBy James P. Chivilo, Gregory R. Meeder, Scott J. DiFiore, Matthew H. Johnson
New construction in metropolitan areas has direct impacts on immediate neighbors and abutters. While noise and dust are generally nuisance concerns, demolition, vibrations, excavation, and dewatering
Jan 1, 2019
-
Resonance Pile Driving with Zero Ground VibrationBy Mark Johnson, Mathew Janes
"The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl
Jan 1, 1900
-
The Use of Rigid Inclusions to Support Large SpansBy Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic
Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr
Jan 1, 2019
-
Bertha Rescue Shaft – SR99 TunnelBy Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015