Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall ConstructionBy Robert Bachus, Jamey B. Rosen
"Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe
Jan 1, 2014
-
3D FEM Modelling of a Ground Improvement SolutionBy Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim
A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo
Sep 8, 2021
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation MethodsBy Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling MethodBy Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DSTBy Gerald Verbeek, Erick Baziw
"Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit
Jan 1, 2017
-
Definition of Drilling-Activity Patterns Based on Production Data ProfilesBy Diego Bellato
Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th
Jan 1, 2019
-
Effect of Cold Joint on Behavior of Block Type Deep Mixing Improved GroundBy M. Kitazume, H. Imai
The deep mixing method was developed in Japan and put into practice in the middle of 1970s. Since then, the wet and dry type methods have been applied for various improvement purposes in Japan. One st
Sep 8, 2021
-
Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina
Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Overview Of The Federal Highway Administration's (FHWA) Deep Foundations Research ? IntroductionBy John L. Walkinshaw
It is obviously not possible in the time given me today to review in great detail all the research of the past 20 years that the (FHWA) has sponsored or participated in. In this presentation I wil
Jan 1, 1993
-
Corrosion Protection Of MicropilesBy Racquel Nottingham, Marc Mastrantuono
Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide
Oct 1, 2022
-
Starsol Piles Foundation Of A Steel Structure At The San Martin De La Vega Resort Park (Madrid)By Claudio Olalla
This paper relates to the foundation of a steel structure located at the San Martin de la Vega (Madrid) amusement park. The structure has more than 100 supports with various loading conditions, includ
Jan 1, 2002
-
Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - SynopsisBy Martin J. Kenwright
Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi
Jan 1, 2000
-
Performance Of A Large Diameter Drilled Pier (f4c3f0c8-a45b-48d0-8d0a-138a34a08ce3)By A. J. Partos
The figures and tables referred to herein are presented in the Proceedings; Volume I, Pages 309 through 316. The 61-story One Liberty Place, at 315 m., is the tallest building 1n Philadelphia and
Jan 1, 1991
-
Session 27 "Grouted Cutoffs"By Trent Dreese
For critical velocities in gravel units we use Bush-Luckner, Sichardt, other empirical equations, and equations derived from laboratory experiments too. On the base of these, we compiled critical velo
Feb 10, 2003
-
Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station ConstructionBy Gordon Chen
As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester
Jan 1, 2010
-
Structural Underpinning By PinpilesBy D. A. Bruce
Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per
Jan 1, 1992
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WABy Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Sonar Calipering Of Slurry Constructed Drilled Shafts - Providing Quality Assurance And Quality Control In Deep FoundationsBy Denton A. Kort
Historically the visual examination of drilled shafts to determine shape was typically done under dry conditions. Many engineers believe that by using a dry method of construction, the question of sha
Jan 1, 2007