Design Of The Marine Foundations For The Skyway Project Of The San Francisco Oakland Bay BridgeBy Gerry Houlahan
The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde
Jan 1, 2013
-
Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability ChallengesBy Shawna Munn, Jakub Hudler
This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines
Jan 1, 2018
-
Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular PilesBy Koichi Kobayashi
Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora
Jan 1, 2006
-
Case History: Effect Of Plastic Clays On The Behavior Of APGD Piles In Central FloridaBy Amr M. Sallam
In recent years, with the increase of the number of high-rise buildings that are proposed and being built in Central Florida especially in Downtown Orlando, Augered Pressure Grouted Displacement (APGD
Jan 1, 2006
-
Converse Probabilistic Analysis And Testing In Situ For Bed Rock Under Pile With Large DiameterBy Peng Jiahong
With ultrasonics application during checking the large diameter cast-in-situ pile body, it is usualy applied the statistical method of probability and PSD. This paper presents a converse probabilistic
Jan 1, 1991
-
Axial Cyclic Degradation of Marine Piles: A Strain-Based Fatigue LimitBy Aaron S. Bradshaw, Ryan M. Coulson
The offshore wind industry in the United States is slowly emerging with the recent construction of the first offshore wind farm located off the coast of Rhode Island. The turbines at the Block Island
Jan 1, 2018
-
Helical Piers with Grouted Shafts -A Case HistoryBy Jr. D'Angelo, Michael M. Blendy, Shawn Downey
"A grouted helical pile was used to support new buildings in the reconstruction of a large residential development. Foundation options were complicated by urban fill underlain with variable alluvial s
Jan 1, 2005
-
Summary of Main Standards and Guidelines on Grouting Available in North America and EuropeBy R. B. King
This document was prepared by the DFI International Grouting Committee with the intent to provide a summary of main Standards and Guidelines available for the North America and Europe grouting industr
Jan 1, 2021
-
Consultants Can Be Safe, Too – A Collaborative ApproachBy Brian FitzPatrick, Michael J. Weaver
Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration
Jan 1, 2019
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
Helix Deflection Effect on Load Settlement Behavior of Pile with Increasing Stress LevelBy Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"Previous studies revealed that the helix deflection reduced the end bearing capacity of screw pile in dense ground even if the installation process is completed with minimal soil disturbance. The ult
Jan 1, 2017
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New ConstructionBy Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - SynopsisBy J. Nakayama
Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of
Jan 1, 1996
-
The Impact Of End Bearing Plate On Micropile Capacity Casted In Cohesive SoilBy Soorkty Elarabi
The aim of this paper is to discuss the impact of end bearing plate on the capacity of micropile. Preliminary studies have been made in Sudan in specific area of cohesive soil. Experimental works were
Oct 1, 2022
-
Downtown Seattle Transit Project - International District StationBy Richard K. Sandaas
Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th
Jan 1, 1990
-
25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction GroutingBy Frank Callanan
The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour
Jan 1, 2009
-
Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train LoadingBy Pratik Goel, Sumanta Haldar
High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera
Sep 1, 2022
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In KolkataBy Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin
This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1
Sep 1, 2022