Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Jet Grouting Underpinning Of A Building In The US

    By Gustavo E. Armijo

    This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose

    Jan 1, 2002

  • DFI
    Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press Foundation

    By David C. Kraft

    A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki

    Jan 1, 2003

  • DFI
    Brightman Street Bridge Replacement Project

    By Arturo Ressi di Cervia

    Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc

    Jan 1, 2003

  • DFI
    Seismic Considerations for Bridge Foundations

    By Lok M. Sharma

    "Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou

    Jan 1, 2017

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • DFI
    Recent Experiences With Bi-Directional Static Load Testing

    By M. England

    Keywords: Bi-directional tests, Osterberg cell, O-cell®, static load tests, Timeset® Static load testing, where loads are applied vertically to the top of the pile and often referred to as 'to

    Jan 1, 2006

  • DFI
    In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons Learned

    By François G. Bernardeau

    Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement

    Jan 1, 2008

  • DFI
    United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication

    By Giovanni A. Bonita

    The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir

    Jan 1, 2006

  • DFI
    Development of Fiber-Reinforced Soil Improvement Using CSM Method

    By Toshio Yonezawa, Helmut Florian, Herbert Kuh, Masamichi Aoki, Takao Koono, Franz-Werner Gerressen

    "To increase the bearing capacity of the ground, soil improvement technique is often adopted. One advantage of soil improvement techniques is the fact, that the impact to the environment is low, as th

    Jan 1, 2015

  • DFI
    The Use Of Micropiles In Estonia

    By T. Ruben

    Micropiles have been used for the last forty years to strengthen building foundations. This article gives information about the technology and capacity of micropiles.

    Jan 1, 2000

  • DFI
    Effect Of Installation On Quality Of Deep Mixed Soil Cement Columns

    By Ali Porbaha

    Rapid growth in the urban development requires continuous search for innovative technologies to construct complex infrastructure systems. Deep mixing is one promising construction technology that has

    Jan 1, 2001

  • DFI
    Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil

    By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi

    "Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei

    Jan 1, 2014

  • DFI
    A Pile-Supported Mat Foundation For A 27-Story Building In Milwaukee, Wisconsin (USA)

    By Alan B. Wagner

    The River Tower is a proposed 27-story condominium building in the heart of downtown Milwaukee, Wisconsin (USA). The tower will be over 100 m tall, and will have a ground area measuring 15 m by 40 m.

    Jan 1, 2002

  • DFI
    Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case History

    By Aly M. Mohammad

    State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,

    Jan 1, 2006

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • DFI
    Session 14 "Deep Mixing Method III"

    By Stefan Dahlin

    The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation

    Feb 10, 2003

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft Construction

    By C. Vipulanandan

    It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • DFI
    Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case Study

    By P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna

    Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec

    Sep 1, 2022