Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Historical Evolution Of The Micropile "Palo Radice" - Inception Of The Micropile

    By Pier Luigi Iovino

    As Technical Director of the Naples, Italy based Fondedile, a geotechnical construction firm specializing in static restoration of structures, Fernando Lizzi, Ing., devoted over 30 years to the pursui

    Jan 1, 2003

  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
    An Overview Of Soil Mixing In The United States ? Introduction

    By Peter J. Nicholson

    Since the reintroduction of soil mixing to the United States over 10 years ago, the work installed by soil mixing technology has grown dramatically. From an annual turnover of less than ten million do

    Jan 1, 2001

  • DFI
    New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)

    By R. Bruce Patterson

    The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H

    Jan 1, 2004

  • DFI
    Estimating N Value from Data in Press-In Piling

    By Yukihiro Ishihara, Nanase Ogawa, Ming Lei

    "Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro

    Jan 1, 2014

  • DFI
    Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall Panels

    There are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration

    Jan 1, 2005

  • DFI
    Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and Casino

    By Michael Arnold, Jonathan Delgado

    In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca

    Jan 1, 2018

  • DFI
    Use of CSM to Support a Heritage Building

    By Chris G. Leach

    "Abstract A seven storey Northbridge area of Perth, Western Australia presented residential apartment complex located in the an opportunity for a novel application of Cutter Soil Mix technology (CSM).

    Jan 1, 2014

  • DFI
    The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)

    By Christian Besson

    This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv

    Jan 1, 2002

  • DFI
    A Study on Bearing Capacity of Waveform Micropiles Using Centrifuge Test

    By Chengcan Wang, Jin-Tae Han, Young-Eun Jang

    "The waveform micropile is a newly developed foundation type for increasing the bearing capacity with the created shear keys on the pile’s shaft. Analyzing the increment of resistance at the shear key

    Jan 1, 2016

  • DFI
    High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case Study

    By James Weaver

    During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari

    Jan 1, 2011

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • DFI
    Stress And Deformation Of Pile Foundation Of Sutong Bridge

    By Yin Zongze

    The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter

    Jan 1, 2006

  • DFI
    Skilled Operative Training For The Foundation Industry - Summary

    By Geoffrey Birch

    A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski

    Jan 1, 2000

  • DFI
    Undergraduate Learning Commons

    By William M. Tanner, Daniel C. Brahana

    "A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,

    Jan 1, 2015

  • DFI
    Geotechnical Assessment Of Highly Saline Soil Stabilized With Fly Ash - Cement Admixtures

    By Jahnavi Parmar, Pranav R. T Peddinti, Saloni Pandya, P. S. Prasad

    Coastal cities are in desperate need of suitable land to meet the ever-increasing demand for urban infrastructure to support commercial, residential, tourism, and off-shore activities. Countries with

    Sep 1, 2022

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • DFI
    A New Analysis Of Data From Statnamic Tests On Piles In Clay

    By William F. Anderson

    A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre

    Jan 1, 2006

  • DFI
    Continuous Grouting In Embedding Of Sheet Piles

    By Jouko L. Lehtonen

    Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m

    Jan 1, 2006

  • DFI
    Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction

    By Anthony H. Tawil

    Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte

    Jan 1, 1987