Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Vibwall Installation - Cardiff Bay Barrage ? SynopsisBy Graeme McWhirter
This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe
Jan 1, 2000
-
Evolving Micropiles: Optimizing Foundations For Seismic RetrofitBy Rob Jameson
Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be
Jan 1, 2008
-
Construction Of Effluent Outfall Diffusers For The Boston Harbor ProjectBy Geoffrey D. Collins
This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay
Jan 1, 1994
-
Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - SummaryBy Alec C. Bloem
A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of
Jan 1, 1991
-
Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General ApproachBy L. C. Reese
? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc
Jan 1, 1988
-
Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
-
Design Of Deep Foundations Over Shallow Mine WorkingsBy Tianfei Liao
Extensive site investigations revealed that abandoned shallow mine workings exist under a site planned for construction of a major new facility. Since the mine voids were susceptible to collapse, they
Jan 1, 2009
-
Innovative Cofferdams Used On The I-205 Columbia River BridgeBy Robert Bittner
The following is a report on the development of two unique and separate cofferdam systems used in the construction of the marine foundations for the I-205 Columbia River Bridge at Portland, Oregon for
Jan 1, 2013
-
Retrofitting Drainage Systems with Pressed-in Sheet Piles in Very Hard Soil in Southern CaliforniaBy Takefumi Takuma, Masashi Nagano, Christopher DellAringa
Multiple agencies in Southern California are retrofitting and upgrading their levees to catch up with ever-advancing urbanization affecting the requirements for existing channels and levees in this se
Jan 1, 2018
-
Partnering for Cutoff Wall Project SuccessBy Osvaldo Valdez, Matteo Bertoni, Aem Ragy
The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the
Sep 1, 2023
-
Quality Control Of Augered Cast-In-Place And Displacement Piles ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is
Jan 1, 2002
-
Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult GeologyBy Steni Stefani, Sanjay Dave
"This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th
Jan 1, 2017
-
Hand-Dug Underreamed Piles At Embankment Place, LondonBy W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
Dewatering Tests for Underground Stations in RomeBy Antonio Zechini, Giuseppe Iorio, Massimo Grisolia
"The new C Line of the Rome Metro runs northwest to southeast across the city center, with 30 new stations and a total length of more than 15.5 mi (25 km). Due to the presence of a dense urban environ
Jan 1, 2017
-
Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - SynopsisBy Sanjeev Malhotra
The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins
Jan 1, 2000
-
Stability Analysis Of Jack-Up Rig At The Bohai Oil Field ? IntroductionBy H. Cheng
The Bohai Oil Company has applied all together 11 jack-up oil drilling rigs (movable platforms) (1) which can be classified in terms of their forms of foundations into two types: the integral mat and
Jan 1, 2010
-
North American Geotechnical Exploration Practice ? SynopsisBy C. O. Riggs
Geotechnical exploration in North America, in particular, exploration for deep foundations analyses, is currently and generally performed following the most basic sampling and insitu testing methods a
Jan 1, 2010
-
Static Load Transfer Computation Of PilesBy Pan Shisheng
Amodified load transfer method computing the displacement, axial compression, skin resistance, toe resistance, and other static bearing behaviours of piles, is propoesd in this paper. Through deriving
Jan 1, 1991
-
Ground Freezing For Shoring Of Excavations - A Case History: 1405/SR522 Vault NW-6By Daniel Mageau
Ground freezing has been used for over 100 years to provide shoring and ground water cutoffs for hundreds of projects worldwide, including drilled shafts, tunnels and cofferdams. Typically, these case
Jan 1, 1998