Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
"The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica
Jan 1, 2017
-
Accessing HistoryBy Richard Pizzi
Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to
Jan 1, 2011
-
Implementation Of Alternative Deep Foundation SystemsBy Ray Zelinski
Caltrans sponsored a research project in 1992 which incorporated proprietary and generic pile types. The piles were subjected to axial tensile/compressive loads in deep, soft soils. Descriptions of va
Jan 1, 1993
-
Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD FoundationsBy Stefano Pirrello
"Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t
Jan 1, 1900
-
New Focus: Environmental Impact Reduction of Proper Slurry Waste ManagementBy Zachary Q. Maassen
The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p
Jan 1, 2018
-
Keynote Lecture 3: G. Stuart Littlejohn Compensation and Permeation GroutingBy G. Stuart Littlejohn
In spite of recent concerns in certain European countries, I believe that silicate-ester grouts will continue to be employed in practice, unless more cost-effective inorganic grouts are developed for
Feb 10, 2003
-
Load Tests on Large Diameter Bored Piles in Cemented Sands (e34a0a63-0fa5-40f6-8850-5a2442305f1f)By Nabil F. Ismael
"Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait. T
Jan 1, 2017
-
Estimation Of Horizontal Deformational Property Using A Pressuremeter Test For The Evaluation Of Lateral Bearing Capacity Of A PileBy Hyung-Min Kwon
There are a number of methods available that can be used to estimate the bearing capacity of piles that are subject to lateral load, such as the theory of subgrade reaction or the elastic continuum ap
Jan 1, 2008
-
Design & Installation of Offshore Driven Piles – A Gulf of Thailand Regional PerspectiveBy Kaushik Mukherjee
"Malaysian offshore and surrounding region are favorable to the installation of driven piles. During the design phase, pile driveability analysis plays a major role in pile make-up design to suit and
Jan 1, 2015
-
Design Of Drilled Shafts Supporting Sound WallsBy Ke Yang
Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again
Jan 1, 2007
-
Construction Of Large Underground Openings And Use Of Grouts ? SynopsisBy E. Mongilardi
The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a
Jan 1, 2010
-
Model Specification Helical Anchor Foundations Tension Applications"This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider
Jan 1, 2016
-
Settelement Of A Piled-Raft Foundation Considering Lateral Pile ResistanceBy Helen S. W. Chow
The use of piled raft foundations for tall buildings has been increasing in this decade as it is an economical alternative to conventional piled foundations. Piled rafts are composite structures compr
Jan 1, 2006
-
“Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down MethodBy Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi
"The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,
Jan 1, 2016
-
Offshore Wind Turbine Foundations - In Denmark And Belgium - IntroductionBy Jørn H. Thomsen
This paper presents the experience gained and the lessons learned over the last decade within the numerous offshore foundation projects undertaken in the offshore waters of Denmark and Belgium by COWI
Jan 1, 2013
-
Using Large Pile Driving Hammers For The Foundation Of Bridges And WindparksBy Bernhard Bruggaier
Outside the oil and gas industry there is an increasing demand to install big piles for the foundation of ports, bridges, and wind-energy plants. This article introduces the design and techniques in u
Jan 1, 2002
-
Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single PierBy Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi
The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines
Jan 1, 2019
-
Unique Foundation Solution For The Shriners Burns Institute Building Expansion - I. IntroductionBy Edmund Cardoza
In the spring of 1993, construction began on an ambitious building project in Boston, Massachusetts. The Shriners organization committed to offer state-of-the-art adolescent burn treatment and rehabil
Jan 1, 1994
-
Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :By Virendra Singh
The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic
Jan 1, 1996