Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment

    By Thomas M. Caruso

    Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,

    Jan 1, 2008

  • DFI
    Strength and Deformations of Piles Supporting Transient Pipe Anchors in Heavy Industrial Pipelines

    By Konstantin G. Ashkinadze

    The paper considers performance of piles supporting transient pipe anchors in heavy industrial pipelines. Events such as pump trips or opening and closing of large valves produce short-term dynamic pu

    Jan 1, 2016

  • DFI
    Combined Piled Raft Foundation (CPRF) response

    By G. L. Sivakumar Babu, P. Chaithra

    "Raft foundations which are used against differential settlements and for carrying heavy loads can still be subjected to excessive settlements even if it is safe against bearing capacity consideration

    Jan 1, 2015

  • DFI
    Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - Outline

    By Les R. Chernauskas

    ? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T

    Jan 1, 2001

  • DFI
    Deep Foundations: Study on Effect of Drilling Fluids on Concrete Integrity

    By Alberto Carmona Rosell, Sri Ram Ramankutty

    "The installation of Bored Piles and Diaphragm Wall under slurry using tremie raises quality concerns on the integrity of concrete. It is vital to understand the effects on concrete integrity during c

    Jan 1, 2015

  • DFI
    Mobilisation Of Skin Friction In Bored Piles In Hong Kong ? Introduction

    By R. A. Fraser

    Large diameter (1.0 to 2.5m) bored piles have been widely used to support buildings and elevated roadways in Hong Kong. Most of these piles are founded on a hard bearing stratum such as granitic or vo

    Jan 1, 2010

  • DFI
    Towards a Performance-Based Design of Drilled Shafts

    By Kam Ng

    For bridges or buildings that may be subjected to large vertical and lateral loads, drilled shafts offer an economic foundation solution. While the current drilled shaft design practice is considered

    Jan 1, 2013

  • DFI
    Sheet Piling Bridge Abutments

    By Robert J. Carle

    This paper reviews a variety of highway structures which have been built using steel sheet piling as the permanent structural elements of bridge piers, abutments and wingwalls. Those structures built

    Jan 1, 1989

  • DFI
    Deep Excavation Support: Innovative Shoring Design in an Urban Environment

    By Richard D. Luark, Fernanda S. Madrona

    Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons

    Jan 1, 2019

  • DFI
    Seven Mile Dam Retrofit - A Global Challenge

    By Arvindh Gupta

    BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally

    Jan 1, 2004

  • DFI
    Time Effect Of Bearing Behavior Of Bored Pile Group In Un-Saturated Silty Soil ? Synopsis

    By J. L. Liu

    Long-term maintained load test on the bored pile group in unsaturated silty soil has been carried out. And the research on the time effects of bearing behavior of pile group has been done by the metho

    Jan 1, 2010

  • DFI
    Response of Pile and Pile Groups against Excavation Induced Ground Movement

    By K Ilamparuthi, R. K. Madhumathi

    "This paper presents the results of 1g model tests conducted on model piles both single and two pile groups embedded in sand by physically inducing lateral soil movement. From the test results it was

    Jan 1, 2015

  • DFI
    Aseismic and Anti-Tsunami Upgrades of Existing Coastal Levees and Seawalls in High Risk Regions

    By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe

    "Japan’s Great Tohoku Earthquake and the immediately following tsunami of March 11, 2011 killed more than fifteen thousand people and destroyed numerous buildings and infrastructures in the northeaste

    Jan 1, 2017

  • DFI
    Numerical Modeling Of Foundation Deformation Due To Fault Rupture

    By Amalia Giannakou

    When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediate

  • DFI
    A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete Pile

    By K. Viking

    It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered

    Jan 1, 2004

  • DFI
    Installation Of Drilled Piers In Shales ? Synopsis

    By A. C. Ackenhell

    The geologic environment of Pittsburgh, Pennsylvania is both inviting and challenging to drilled pier installation. The shales and clayey soil zone of the hills are favorable but the alluvial soils of

    Jan 1, 2010

  • DFI
    Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression Tests

    By Padmavathi V, M. Najamuddin, M. R. Madhav

    Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation

    Sep 1, 2022

  • DFI
    Change In Bearing Capacity Of Bored Steel H Piles Enclosed In Soil-Cement Columns With Overburden Pressure - Synopsis

    By Tomio Tsuchiya

    A construction method of bored steel H piles enclosed in soil-cement columns was developed by modifying steel H piles from the driven pile method and soil-cement walls from the earth retaining wall me

    Jan 1, 1996

  • DFI
    Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future Generations

    By John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse

    This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1

  • DFI
    Evaluation Of Pile Load Test Results

    By Rasin Duzceer

    In this paper, the results of pile load test on 24 piles from twelve sites are presented. The pile load tests were performed on 14 driven and 10 bored piles of varying diameters and lengths installed

    Jan 1, 2002