Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design Of Drilled Shaft Supported Mat Moscow TowersBy Issa S. Oweis
Two Towers are currently under construction in Central Moscow in the Russian Federation. Building A is a 96 story tower and Building B is a 65 story tower. The columns in both structures bear on a t
Jan 1, 2007
-
Interactive Encased Stone-Column Foundation - SynopsisBy P. M. Deshpande
An interactive short column system is evolved as alternative to deep foundation system in deep layers of marine clay, the interaction of encased stone column and marine clay carry load without causing
Jan 1, 1996
-
Safe Load Of A Single Pile In Earthquake Loading - SynopsisBy Shamsher Prakash
Estimation of vertical load carrying capacity of a single vertical pile under earthquake loading is an important task of a design engineer. Lateral vibration of vertical pile is highly influenced by t
Jan 1, 1996
-
Stemmers Run Steel Sheet Pile Cofferdam And TrestleBy Jennifer Peirce Brandt
Project documents and the United States Army Corps of Engineers? permit for construction of the Stemmers Run Relief Wastewater Force Main across the Back River in Baltimore County, Maryland specified
Jan 1, 2008
-
Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t
Jan 1, 2002
-
Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic TestingBy Achyut Kumar Allady, Praveen Arumughan
NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza
May 1, 2022
-
Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved ClayBy Carl Ealy
Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m
Jan 1, 2002
-
High Capacity Drilled Piles in BrooklynBy Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe
"The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount
Jan 1, 2016
-
Concrete Piles Driven In A Coral SandBy L. D. Johnson
12 groups of 12 precast prestressed (PCPS) piles were driven in the lagoon of Kwajalein Island to support a dry dock. Pre-construction investigation of the calcareous coral sands and static pile loeid
Jan 1, 1993
-
Session 28 "Modeling and Verification"By Dawn Shuttle
In trying to find a grout, or some kind of stabilizer that would work in this application, we established some performance criteria. Of those, what I controlled the most was viscosity, then I had a wh
Feb 10, 2003
-
Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical MethodsBy Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Lateral Load Testing Of Pile FoundationsBy Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Lessons Learned From Mitigating Early Project Delays To Deep Foundation WorkBy Jeffery L. Ottesen
Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti
Jan 1, 2002
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Tension Tests On Driven Pipe Piles In Sand - SynopsisBy Alan J. Lutenegger
A series of tension tests were performed on prototype scale steel pipe piles at two sites to evaluate the influence of scale and pile plugging on the unit skin friction developed in axial tension. The
Jan 1, 2000
-
Effects Of Permanent And Temporary Loads On Allowable Bearing Capacity Of Piles Subjected To Nagative Skin FrictionBy Mohammad T. Izadi
Piles are, often, used for transferring load from the super structure through soft consolidating strata onto relatively stiff uncompressible soils. Downward movement of the soft soil strata develops
Jan 1, 2001
-
St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test ProgramBy Jeffrey A. Gebhard
As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes
Jan 1, 2009
-
Some Experiences In Construction And Design Of Stone Column Reinforced Ground ? SynopsisBy C. W. Sheng
In this paper conventional construction procedure is briefly described for the installation of stone columns in soft ground in China. A viewpoint concerning the mechanism of ground improvement by use
Jan 1, 2010
-
Installation And Testing Of 260 Hollow Core Bar MicropilesBy Jesús E. Gómez
A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n
Jan 1, 2007