Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
General Report - Deep Excavations "He Who Pays The Piper Calls The Tune"By Tim Chapman
This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f
Jan 1, 2006
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual RealityBy Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case StudyBy Krishnendu Mandal
"For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile
Jan 1, 2015
-
-
Controlling Thermal Stresses in Barrier WallsBy Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Soil Damping In Saturated Sandy Soils For Determining Capacity Of Piles By Wave Equation AnalysisBy Mark R. Svinkin
This paper deals with application of the wave equation analysis to determine capacities of piles driven in saturated sandy soils. It shows that pile capacity in sandy soils changes with time after the
Jan 1, 1995
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Realizing The Benefits Of LRFD For Deep FoundationsBy Bernard H. Hertlein
The introduction of LRFD methods for structural design has been a gradual process by AASHTO, ACI, AISC, ASCE, and the FHWA, which has largely been ignored by the deep foundations industry. In 2007, ho
Jan 1, 2007
-
Digitalization in Reverse Circulation Drill RigsBy N. Schmitz
This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem
Sep 8, 2021
-
Real-Time Anchor Testing and Data ManagementBy Bora Okumusoglu, Devon K. V. Mothersille
"AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front
Jan 1, 2017
-
Load Testing MethodsThis Section describes four alternative methods for load testing of drilled shafts: high strain dynamic test (HSDT), rapid load test, static load test, and bottom load test. Until recently, static loa
Jan 1, 2004
-
LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) TestBy Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles
"This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te
Jan 1, 2017
-
Sustainability: A Role for Blended Cements and Industrial Byproducts in Soil Mixing, Grouting, and Slurry WallsBy Charles M. Wilk, Lori Tiefenthaler
"Information presented in this paper can be used to support deep soil mixing, subsurface grouting and slurry wall technology as sustainable construction technologies. Ordinary Portland Cement (OPC) is
Jan 1, 2017
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, WisconsinBy Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
State-of-the-Art Rock Socket Analysis and Design for Laterally Loaded Drilled ShaftsBy Aly Mohammad, Dongyi Yue
"The design of rock sockets for drilled shafts and piles proves to be a challenge for the Design Engineer. The magnitude of loads on the shaft and the behavior of the rock are critical in determining
Jan 1, 2005
-
Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring SystemBy Stephan Großwig, Karolina Nycz, Arne Kindler
"Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu
Jan 1, 2017
-
Ground Freezing Combined Method for Urban Tunnel ExcavationBy Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto
"The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three
Jan 1, 2015
-
Installation Parameters, Pile Performance and Importance of TestingBy Maurice Bottiau
"Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co
Jan 1, 2014
-
A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty GroundBy H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi
"In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe
Jan 1, 2015
-
Dynamic Analysis Of Follower Driven Piles For The Venice Flood Gate ProjectBy Frank Rausche
Without doubt, driven piles are the most economical deep foundation element for a nearshore environment, providing for high bearing capacities and stiffness, quick installation times, assured quality
Jan 1, 2006