Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • DFI
    Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?

    By G. G. Goble

    Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese

    Jan 1, 1993

  • DFI
    Vibration Isolation at the Dana-Farber Yawkey Center: OPA Finalist

    By David R. Shields, Michael T. Bracher

    "The $330 million (U.S.) Dana-Farber Cancer Institute’s Yawkey Center for Cancer Care (Yawkey Center) sits in the heart of Boston’s Longwood Medical Area. The Yawkey Center is a cutting-edge cancer ca

    Jan 1, 2012

  • DFI
    Response to Load for Four Different Types of Bored Piles

    By Mario Terceros H., Bengt H. Fellenius

    "ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore

    Jan 1, 2014

  • DFI
    Northeast Boundary Tunnel – Mount Olivet Road Drop Shaft

    By Jeremiah M. Jezerski, Russell H. Lutch

    The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed

    Oct 1, 2022

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic Test

    By Liqun Liang

    Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and

    Jan 1, 2011

  • DFI
    Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement Project

    By Richard Hanke, Franz-Werner Gerressen

    "The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re

    Jan 1, 2015

  • DFI
    Characteristic Features of Deep Excavations in the Metropolis and the Probable Hazards.

    By Sudhir Kumar Das

    "The exorbitant price of the land in the metropolis has restricted the horizontal expansion and compelled the owners, the developers and the engineers to opt for vertical expansion. This has resulted

    Jan 1, 2015

  • DFI
    A New Low-Cost Bi-Directional Load Test Technique for Drilled Shafts

    By Sherif Elfass, Gary Norris

    Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s

    Sep 8, 2021

  • DFI
    The Advantages Of Arbitration - I. Arbitration Defined

    By John B. Tieder

    Arbitration is a legally recognized alternate litigation for the resolution of civil disputes. The parties agree, either before or after a dispute arises, to submit that dispute to an independent thir

    Jan 1, 1988

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • DFI
    PVC And Steel Access Tube Debonding During Sonic Logging Testing For The SC 170 Bridge Replacement Project

    By Edward L. Hajduk

    During sonic logging quality control testing of the drilled shaft foundations for the replacement bridges crossing the Broad and Chechessee Rivers for SC 170 in Beaufort County, South Carolina, irregu

    Jan 1, 2004

  • DFI
    Inspection and Observation Methods

    "Full time inspection of drilled shafts by qualified personnel is a necessary part of construction. Detailed inspection procedures for routine inspection are provided in the Drilled Shaft Inspector’s

    Jan 1, 2004

  • DFI
    Use of Isolated Tie-Back Plates to Stabilize a Landslide in Steep Terrain

    By Scott D. Neely, Donald R. Clark

    "An existing landslide located at the southeast corner of the Telluride Regional Airport has been in an active state of failure for several years. The presence of the landslide has represented an on-g

    Jan 1, 2015

  • DFI
    4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction

    By B. De Paoli

    At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e

    Jan 1, 1994

  • DFI
    Alternative Binder For Ground Improvement To Reduce Co2 Footprint

    By Brandon M. Robinson, Osman F. Besler, Dominik Gaechter

    The Sandbukta-Moss-Såstad (SMS) project is a part of the Intercity development project, which is part of the largest transport project in Norway, consisting of 270 km of new double-track rail. The SMS

    May 1, 2022

  • DFI
    Presentation #6 - Rapid Load Testing: A New Choice For Pile Testing

    By Michael D. Justason

    ...a global perspective... In March of 2000, the Japanese Geotechnical Society added "Rapid Load Testing" to their national standard for pile testing. In the year 2000. it is estimated that th

    Jan 1, 2001