Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)By Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in
May 11, 2007
-
Block 43: Diverse Technologies in Complex Site ConditionsBy John Kvinsland
"The Block 43 Project is the future home of the Paul Allen Institute for Brain Science located just off the southern shore of Lake Union in Seattle, Wash. The South Lake Union (SLU) district experienc
Jan 1, 2014
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Piling Adjacent To Rail Tunnels At King’S Cross CentralBy David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile ConstructionBy Andrew L. Peterson
CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac
Jan 1, 1997
-
Recent Experiences With Bi-Directional Static Load TestingBy M. England
Keywords: Bi-directional tests, Osterberg cell, O-cell®, static load tests, Timeset® Static load testing, where loads are applied vertically to the top of the pile and often referred to as 'to
Jan 1, 2006
-
Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic BuildingBy Tai Luu, Maxim C. Schisler, Yaser Taheri
The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student
Jan 1, 2019
-
Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional InstallationBy Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru
"Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa
Jan 1, 2017
-
Design And Performance Evaluation Of Bored Piles In SandBy Ashutosh S. Dhar
Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in
Jan 1, 2006
-
Nonlinear Response of Piles with Rigid Embedment: Lessons Learned from a Reduced- Scale ExperimentBy Camilla Favaretti, Benjamin Turner, Anne Lemnitzer
Pile foundations are extensively used in the construction of various types of superstructures, including tall buildings, bridges, freeways and offshore structures. A fully constrained tip embedment su
Jan 1, 2018
-
Bearing Capacity Of Piles Determined By Field Tests ? SynopsisBy D. M. Milovic
On the basis of relatively large number of field load tests of piles, the determination of the ultimate bearing capacity have been studied. Using the load settlement curves and the results of the cone
Jan 1, 2010
-
Alternative Deep Basement Solutions for Built- Up AreasBy Abid Adekunte
"In recent years, developers have had to deal with complexities associated with numerous cases of deep basement construction in built-up areas. Design and construction of deep excavation support syste
Jan 1, 2015
-
Identification and Quantification of Pile RelaxationBy Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019
-
The Aged Reloading Response Of Piles In ClayBy Paul Doherty
It is known that the axial capacity of a displacement piles installed in clay varies with time. Consolidation theory suggests that dissipation of porewater pressure set-up during pile installation wou
Jan 1, 2011
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont TowerBy Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Case History: Effect Of Plastic Clays On The Behavior Of APGD Piles In Central FloridaBy Amr M. Sallam
In recent years, with the increase of the number of high-rise buildings that are proposed and being built in Central Florida especially in Downtown Orlando, Augered Pressure Grouted Displacement (APGD
Jan 1, 2006
-
An Alternative Pile TechnologyBy Rimas Veitas, James Panton, Erich Steinlechner
"Ductile Iron Piles (DIPs) are a proven, viable alternative to conventional piles, and for the past five years have been successfully used throughout New England. The installation process of DIPs lend
Jan 1, 2017
-
Construction Considerations For Ground Modification Projects ? SynopsisBy J. P. Welsh
Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan
Jan 1, 2010
-
Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone GroundBy Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu
During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston
Jan 1, 2018
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
Jan 1, 2013