    Bridge Pier Remediation, New London CT

    By Walter Kaeck

    In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign

    Jan 1, 2009

  • DFI
    Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case Study

    By Prasanta Paul, Aminul Islam

    "Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The propos

    Jan 1, 2015

  • DFI
    Vertical Load Sharing of Piled Raft with Grid-Form Deep Mixing Walls

    By J. Hamada, K. Yamashita, Y. Shigeno, T. Tanikawa

    "This paper offers a case history of piled raft foundation in soft ground supporting a twelve-story building in Tokyo. To increase bearing capacity of the soft soil as well as a countermeasure of liqu

    Jan 1, 2015

  • DFI
    DFI Europe Monitoring and Instrumentation Committee Objectives

    By Rob van Dorp

    "AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta

    Jan 1, 2014

  • DFI
    Some Experience With Large Diameter Caissons ? Synopsis

    By I. H. Wong

    The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee

    Jan 1, 2010

  • DFI
    Dynamic Analysis Of A Base-Isolated Bridge, Seattle, Washington

    By Jeremy Butkovich

    Dynamic soil-structure interaction (DSSI) analyses are becoming more common in bridge designs, especially in seismically active areas. Because of its proximity to two active fault zones, the Evergree

  • DFI
    Evaluating Bending Failure Of Floating Soil-cement (Sc) Columns Under Road Embankments Using 3d Fea

    By Sailesh S. Author

    The current design method for soil-cement (SC) columns improved soft clayey ground under the highway embankments assumes a slip circle failure surface shearing through the columns and the soils using

  • DFI
    Contribution of Inner Frictional Resistance to Bearing Capacity of Open-Ended Piles

    By Janaka J. Kumara, Takashi Kurashina, Yoshiaki Kikuchi, Takahiro Yajima

    "The inner frictional resistance of open-ended piles depend heavily on the degree of soil plugging. Many factors including pile diameter, relative density and end conditions of the piles influence the

    Jan 1, 2017

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • DFI
    Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a Wetland

    By Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian

    "Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2

    Jan 1, 2017

  • DFI
    Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational Structure

    By Lawrence P. Goldfarb

    The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center

    Jan 1, 2009

  • DFI
    Business Benefits Of An Integrated CFA Rig Instrumentation System

    By Jason N. Scott

    CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi

    Jan 1, 2006

  • DFI
    Fogg Museum Expansion - Support of Excavation Design and Construction

    By James L. Christensen, Gregory Sanchez, Michael P. Walker

    The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat

    Jan 1, 2015

  • DFI
    Helical Pile Foundation Anchors As A Practical Alternative

    By Dilip Khatri

    Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ

    Jan 1, 2003

  • DFI
    Ground Improvement for New Jersey Turnpike Interchange 14A: A Case Study

    By Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed

    "Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons

    Jan 1, 2017

  • DFI
    Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load Tests

    By David J. Puller

    As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river

    Jan 1, 2002

  • DFI
    Experiences With Heavy Drop Hammer Testing Of Rock-Socketed Shafts

    By Frank Rausche

    Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust

    Jan 1, 2006

  • DFI
    Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples

    By J. Nakayama

    Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t

    Jan 1, 1989

  • DFI
    Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load Test

    By Scott M. Mackiewicz

    This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T

    Jan 1, 2008