1785 Massachusetts Ave. NW, Washington, D.C.By Daniel Stevenson, Richard Guenther
"The preservation of historic buildings is not only essential to the understanding of our national heritage, but it is also environmentally responsible to adapt existing buildings to compatible new us
Jan 1, 2017
-
Foundation Retrofit Design and Construction for the Benicia-Martinez Bridge, Martinez, California - 1998 DFI Annual Conference October 7th-9th, 1998 Seattle, WashingtonBy Roy A. Imbsen
Following the 1989 Loma Prieta earthquake, California Department of Transportation (Caltrans) expedited an effort to evaluate and retrofit important state-owned toll bridges to enhance performance of
Jan 1, 1998
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
A Comparison Of Static And Statnamic Load Tests In Sand: A Case Study Of The Bayou Chico Bridge In Pensacola, Florida ? SummaryBy Michael D. Justason
This paper details the static and Statnamic load testing on a 600 mm square pre-stressed concrete pile. The pile was located at Pier 15 on the 20 million-dollar Bayou Chico Bridge Project in Pensacola
Jan 1, 1997
-
Instrumented Pile Load Tests In The Area Of Pearl Harbor, HawaiiBy John Y. L Chen
This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex
Jan 1, 2002
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation ProjectBy Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Using Multiple Pile Types On A Single Project To Maximize BenefitsBy James F. Davis, Matthew A. Conte, Robert F. Tonning
This is a paper demonstrating the steps taken to combine multiple types of piles for a single site to maximize the benefits and characteristics of each method. We intend to discuss the use of grouted
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site IiBy Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally
Oct 1, 2022
-
Experimental Investigation on Drag Load Acting on Single End-bearing Piles in Collapsible Soil due to InundationBy Adel M. Hanna, Ibrahim M. Mashhour
"Collapsible soil is known as one of the difficult soils, which possesses considerable strength when it is dry and significantly reduced when inundated. In practice, in case of a thick layer, pile fou
Jan 1, 2015
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, LaBy Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) TestBy Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles
"This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te
Jan 1, 2017
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
Dealing with Complexities Associated with the Application of Bored Pile Retaining Walls in Urban DevelopmentsBy Abid Adekunte
"Engineers and developers have witnessed the growing popularity of deep basement structures as components of urban commercial and residential developments. This is often attributed to inadequate surfa
Jan 1, 2017
-
Axial Behavior Of Auger Cast Piles In Inner Coastal Plain GeologyBy Brain E. Ladd
A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
-
Remedial Method for Collapse Soil Foundation of Mosul DamBy Arash Khosravifar, Ali N. Ibrahim
"Large areas of Iraq are covered with collapsible soils namely gypsiferous soil which is often used as the foundation soil for structures. In particular, the Mosul Dam foundation is comprised of high
Jan 1, 2017
-
Piling Framed Tie down Concrete Retaining WallBy Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins
Jan 1, 2007
-
Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)By Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in
Jan 1, 2007
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
Effect Of Pressurized Drilling Methods On The Lateral Load Capacity Of Drilled Shafts - A Practical Insight And An Analytical ApproachBy Özgür Bezgin
This paper presents observations on the installation of drilled shafts from two construction projects and an academic study with experimental and analytical parts. The construction projects involved t
Jan 1, 2009