  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2005

  • DFI
    Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)

    By George C. Webb

    A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in

    Jan 1, 2003

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)

    By George Piscsalko

    Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

  • DFI
    History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - Summary

    By James S. Graham

    Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area

    Jan 1, 2000

  • DFI
    Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)

    By George Piscsalko

    "Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

    Jan 1, 2017

  • DFI
    Toward Understanding the Seismic Performance of Rigid Inclusions

    By J. Tanner Blackburn, James R. Gingery, Lisheng Shao

    Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.

    Jan 1, 2018

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)

    By Tracy Brettmann

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2001

  • DFI
    Analysis Of Vibratory Driven Pile ? Introduction

    By Sherrill Gardner

    Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type

    Jan 1, 1987

  • DFI
    Piled Raft On Layered Soils

    By Luca de Sanctis

    The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th

    Jan 1, 2002

  • DFI
    Resonance Test On Piles - Synopsis

    By Y. Z. Xu

    This paper presents a new dynamic method called Resonant Pile Test (HPT) for evaluating bearing capacity of pile. The basic conception of RPT is given in brief and the measuring system is also introdu

    Jan 1, 2010

  • DFI
    Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity Piles

    By W. G. K. Fleming

    Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m

    Jan 1, 1991

  • DFI
    St. Anthony Falls I-35W Bridge - Deep Foundation Monitoring Methods And Equipment For Bridge Construction

    By Bryan C. Field

    The proposed construction schedule for the St. Anthony Falls I-35W Bride challenged the abilities of the design-build teams to utilize the best and most efficient methods to meet Minnesota Department

    Jan 1, 2009

  • DFI
    A Review On Pedestal Piles

    By Venkatesh S. V J, Shubha M, Srilakshmi G

    Choosing for the best option of pile foundations to overcome large lateral and uplift loads for the foundations in transmission line towers/offshore environment is still being a concern to achieve the

    Sep 1, 2022

  • DFI
    Micropile Performance Variability: A Fundamental Case Study

    By Walter E. Vanderpool

    Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.

    Jan 1, 2002

  • DFI
    Current Practice For Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control

    By Rudolph P. Frizzi

    Structures supported on ACIP and DD piles perform successfully when quality control is maintained from the initial site subsurface investigation through pile design, bidding, and construction. The fou

    Jan 1, 2005

  • DFI
    Pile Foundation, Retaining Structures For Deep Excavation And Anti-Buoyancy Anchors In Shanghai Soft Soils

    By Sun Gengsheng

    Geotechnical properties of soils, usual types of pile foundations, pile capacity, calculation of settlements of pile foundations, usual types of retaining structures for deep excavation, stability ana

    Jan 1, 1991

  • DFI
    Piled Raft Floats On Moraine

    By Terence P. Holman

    Instrumented load testing of high capacity micropiles, followed by detailed analysis and numerical modeling, provided an opportunity for real foundation performance to be incorporated into the design

    Jan 1, 2007

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • DFI
    Design Equations For Laterally Loaded Piles Embedded In Sand

    By T. G. Davies

    The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to

    Jan 1, 2010

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    "The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica

    Jan 1, 2017