Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, TorontoBy Graeme Smart, Thomas Fiala
"Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron
Jan 1, 2015
-
Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In BaltimoreBy S. Y. Fantaye
This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma
Jan 1, 2008
-
Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - IntroductionBy Alan Alhadeff
Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi
Jan 1, 1990
-
Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo
"INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project
Jan 1, 2006
-
Soil Freezing Under A Volcano: The Naples Piazza Garibaldi Experience Using Directional Drilling For Long BoreholesBy D. Vanni
Constructing new infrastructure in urban areas increasingly entails the use of sophisticated techniques for soil improvement in order to minimize surface disturbances in adjacent areas and damage to e
Jan 1, 2006
-
Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"By R. Paul De Bruyn
A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.
Jan 1, 1990
-
The First Cut-Off Wall In The Indian Himalayas For The Dam Of The Dhauliganga Hydroelectric ProjectBy Wolfgang G. Brunner
In the far north of Uttar Pradesh Province in the Indian Himalayas, the 280 MW Dhauliganga hydroelectric power plant is under construction by National Hydroelectric Power Corporation (NHPC), a state-
Jan 1, 2004
-
Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
A Review of the Design Formulations for Static Axial Response of Deep Foundations from Cone Penetration Test DataBy Fawad S. Niazi
Analysis of deep foundations in terms of axial capacity has been a topic of great interest in the soil-structure interaction problems. Soil behavior is governed by a series of complex stress-strain ch
Jan 1, 2013
-
Ground Improvement For The Deep Foundation Of A 650 M Long Quay Wall In The Port Of HamburgBy Peter Arz
In the port of Hamburg a 650 m long quay wall was completed in mid-1985. The watertight wall consists of loadbearing steel buttress piles PSP 1012 which are up to 28 m long and infill interlocking she
Jan 1, 1987
-
Estimation Of Horizontal Deformational Property Using A Pressuremeter Test For The Evaluation Of Lateral Bearing Capacity Of A PileBy Hyung-Min Kwon
There are a number of methods available that can be used to estimate the bearing capacity of piles that are subject to lateral load, such as the theory of subgrade reaction or the elastic continuum ap
Jan 1, 2008
-
Full Scale Loading Tests Of NF Pile ? SynopsisBy M. Nomura
This paper describes the results and field measurements of two long-term observation tests and two short-term loading tests to confirm the effectiveness of NF piles in reducing negative skin friction.
Jan 1, 2010
-
Cement Deep Mixing in Lach Huyen Port Infrastructure Construction Project in Northern VietnamBy Masakazu Takano, Koji Suzuki, Naotoshi Shinkawa
"Cement deep mixing (CDM) method successfully applied to a marine construction project in northern Vietnam is reported. The method is classified as wet method, in which cement slurry is injected into
Jan 1, 2015
-
Errata (5268ac87-18a9-458e-b334-4f72060324e3)Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'
Jan 1, 1994
-
Keynotes: Axial Capacity Of Drilled Foundations In Soft Rocks And Intermediate Geomaterials - Presentation NotesBy Michael W. Neill, O&apos
This presentation addresses some of the problems encountered in estimating the capacity of drilled shafts and augered, cast-in-place piles in soft rock. Methods to quantify side and base resistance ar
Jan 1, 2001
-
Selection And Design Of Continuous Flight Auger And Drilled Displacement PilesBy Dan Brown
This paper provides an overview of the advantages and limitations of continuous flight auger (CFA) and drilled displacement (DD) systems compared to other deep foundation systems, along with a summary
Jan 1, 2005
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Session 28 "Modeling and Verification"By Dawn Shuttle
In trying to find a grout, or some kind of stabilizer that would work in this application, we established some performance criteria. Of those, what I controlled the most was viscosity, then I had a wh
Feb 10, 2003
-
Augercast Piles - History And AdvancementsBy Larry Rayburn
Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout
Jan 1, 2005
-
Cut-and-Cover Excavation ChallengesBy Sitotaw Y. Fantaye
"The first segment of the Second Avenue Subway extension is approaching construction completion. The new extension will operate along Second Avenue from 96th Street to 63rd Street, where it will diver
Jan 1, 2016