    King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced Settlement

    By Clif Kettle

    The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified

    Jan 1, 2008

  • DFI
    Comparing Analytical Models With Slipping And Non-slipping Interface In Axially Loaded Tension Piles

    By Kelvin Lo, Erwin Oh, Darren Newel

    The use of interface elements is widespread in most numerical methods to separate the structural elements from soil elements. It allows slipping and gapping or overlapping between the two media in con

  • DFI
    Use Of Installation Effort To Evaluate And Design Drilled Displacement Piles In Fine-Grained Soils

    By W. Morgan NeSmith

    A drilled displacement pile program was utilized for the expansion of an existing power plant in Cohasset MN adjacent to the Mississippi River. The drilled displacement (DD) pile is an innovative foun

    Jan 1, 2008

  • DFI
    The Effects Of Heating And Cooling Energy Piles Under Working Load At Lambeth College, UK

    By Tony Amis

    There is very limited information relating to the potential impact of temperature cycles, outside the variation that occurs naturally, on the behaviour of foundation piles. Such thermal loading occurs

    Jan 1, 2008

  • DFI
    Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)

    By Hennie F. T. Barnard, Theodore E. B. Vorster

    Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me

    Jan 1, 2017

  • DFI
    Evaluation Of Degree Of Overconservatism In Api Shaft Friction Of Piles In Marine Sand Of The Arabian Gulf

    By Ahmed H. Bukhary, Naser A. Al-Shayea

    The objective is to assess the overconservatism in the parameters used for designing offshore piles. Methodology includes analysis of shaft friction data obtained from more than five different locatio

  • DFI
    A Combination of Jet Grouting and MPSP Grouting in Iskar River Cascade Hydropower Plant in Bulgaria

    By Massimo Poggio, Gabriele Balconi, Andrea M. R. Pettinaroli, Mario Ruggiero, Riccardo Castellanza

    Grouting technologies are ground treatment techniques used for modifying the behaviour of a mass of soil or rock by injecting a mixture. The sleeved port pipes (also called Tube A Manchette) are highl

    Jan 1, 2019

  • DFI
    Sonar Calipering Of Slurry Constructed Drilled Shafts - Providing Quality Assurance And Quality Control In Deep Foundations

    By Denton A. Kort

    Historically the visual examination of drilled shafts to determine shape was typically done under dry conditions. Many engineers believe that by using a dry method of construction, the question of sha

    Jan 1, 2007

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Secant Pile Wall

    By Andrew Cushing

    This paper presents the design and construction of the foundation for a major high-rise real estate development on the west side of Manhattan. Arup was retained by Underpinning and Foundation Skanska

    Jan 1, 2008

  • DFI
    Innovations In Diaphragm-Wall Construction Plant

    By Maurice Guillaud

    The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th

    Jan 1, 2002

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica Schist

    By Cem Altuntas

    This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb

    Jan 1, 2008

  • DFI
    Drilled Shaft In Strong Rock-Design, Validation, And Construction Of The Beauharnois Canal Bridge, Autoroute 30 Montréal

    By Ivan Hee

    The 2.5km long bridge over the Beauharnois Canal and St. Lawrence Seaway is a major structure in the new Autoroute 30 project near Montreal. Foundations for the bridge consist of footings on bedrock,

    Jan 1, 2011

  • DFI
    Numerical and Theoretical Analysis of Consolidation of Soft Clay Installed With PVD at Nagapattinam - A Case Study

    By KeerthiRaaj Subrmanian, Muthukkumaran Kasinathan

    "A railway embankment is under construction between Nagapattinam to Thiruthuraipoondi covering 36.5 km. The sub-soil strata comprises of soft clay extending up to 10 m below existing ground level, whi

    Jan 1, 2015

  • DFI
    Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment

    By Thomas M. Caruso

    Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,

    Jan 1, 2008

  • DFI
    Lateral Behavior Of Post Grouted Drilled Shafts

    By Emad Farouz, Ehab S. Shatnawi, Charles Winter

    The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilled-shaft diameters has motivated the development and increased use of a base grouting (BG) techniqu

  • DFI
    Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)

    By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung

    "Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt

    Jan 1, 2017

  • DFI
    A Collaborative Approach To The Design And Delivery Of The Most Heavily Loaded Piles Ever Constructed In The Uk

    By Morris J. D, Baldwin Z., Wiltcher P. M

    21 Moorfields is an oversite development in central London spanning Moorgate tube station. It required the installation of both the highest loaded bearing piles and the highest top loaded static pile

  • DFI
    Marine Foundations Of Bridges In The Northeastern USA

    By James S. Graham

    Marine design and construction methods are presented on the caisson foundations for the tower piers at the Brooklyn, Ben Franklin, Delaware Memorial 1st, Tappan Zee, Walt Whitman, Throgs Neck, Verraza

    Jan 1, 2005

  • DFI
    Full-Scale Tests To Evaluate Lateral Pile Resistance At The Edge Of A Slope

    By Artak D. Mirzoyan

    Pile foundations near the edge of a slope are often required to resist lateral loads. This is particularly important for piles at abutments of bridges. However, very few full-scale tests are availab

    Jan 1, 2007

  • DFI
    New Load Testing Device

    By Jorj O. Osterberg

    This paper is for presentation at the 14th Annual Members Conference of the Deep Foundations Institute held at the Hyatt Regency Hotel, Baltimore Maryland on October 10, 1989. This is an introduct

    Jan 1, 1989