Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement PilesBy Lisa M. Splitter
Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill
Jan 1, 2009
-
Holding Back The Watchung MountainsBy Ryan C. Linthicum
A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains
Jan 1, 2003
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
Sonic Integrity Testing - 1.0 SummaryBy A. F. van Weele
In general cast-in place piles will have an irregular pile shape. However, it is possible that these irregularities are so large that they may lead to pile deficiencies. It is very rarely possible to
Jan 1, 1987
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
History Of Chicago Foundation Systems & Underground Construction ? SummaryBy Theodore R. Maynard
The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to
Jan 1, 1991
-
Piling Problems - IntroductionBy D. Millgard
Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.
Jan 1, 1991
-
Tied-Down Boat Section ConstructionBy Romano J. Micciche
One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High
Jan 1, 1994
-
Deep Foundation Support for the Iconic New York WheelBy Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran
"This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor
Jan 1, 2016
-
Environmental Considerations For Foundation Construction In The Boston Area - The New MCPBy James V. Errico
On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts
Jan 1, 1994
-
Measured And Predicted Response Of Laterally Loaded Piles - SynopsisBy K. Mallikarjuna Rao
There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction
Jan 1, 1996
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Piling Practice in Sedimentary Granular Soils of Santa Cruz, BoliviaBy Mario Terceros H, Bengt H. Fellenius
"ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su
Jan 1, 2014
-
Opimization of Solid and Hollow Micropiles for Shallow Foundations on SandBy P. D. Arumairaj, B. Vani
"Micropiles are small diameter cast insitu reinforced grouted piles and it has been effectively used in many applications of ground improvement. It increases the load carrying capacity of soil and red
Jan 1, 2015
-
Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy SoilsBy Luo Yang
It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid
Jan 1, 2006
-
Excavation Construction for the Transbay Transit CenterBy Nick O’Riordan, Kaitlyn L. Fleming, Michael Riemer, Youssef M. A. Hashash, Stephen McLandrich, Mohamad Jammoul, Pierre Gouvin, Andrew Yeskoo
"To accommodate urbanization, cities are developing more underground space as a means to house public transportation systems and other entities. Underground developments often require construction of
Jan 1, 2015
-
Theoretical And Experimental Investigation On Underwater Ground AnchorsBy Leonello Sciacca
Deepening of harbours has become a priority, necessary to the ongoing operation of the wharves in the face of deeper draft merchant vessels and cruise ships. It is now standard practice in many areas
Jan 1, 2011
-
Execution of Diaphragm and Cut-Off-Walls in Rock – Applications, Performance and LimitsBy Albert Neumann, Franz-Werner Gerressen, Giancarlo Santarelli
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. In addition they are also quite often used as deep groundw
Jan 1, 2016
-
Installation And Testing Of Instrumented Tieback Anchors - IntroductionBy Joan Stoupa
The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili
Jan 1, 1990
-
Innovative Non Encroaching Retaining WallBy Dino Kartofilis, Rick Deschamps, Giovanni (John) Bonita
"Anew condominium complex in Arlington, Va., presented some formidable constraints. One was the requirement for a permanent retaining wall to support a 48.5-ft (15-m) cut and an existing 16- story bui
Jan 1, 2009