Complex Deep Foundation System for Tall Tower in New York CityBy Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f
Jan 1, 2017
-
Jet Grouting Soft Clays for Tunnelling & Deep Excavations Design & Construction IssuesBy Marcelo Chuaqui
We certainly have the data to back calculate it. I must admit that I haven't, at the moment my priority is not on what is the stiffness of the jet grout but is making sure that the jet grout is r
Feb 10, 2003
-
Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier WallsBy R. Lee Wooten, David R. Shields, Darren D. Clark
"Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con
Jan 1, 2016
-
Bearing And Friction Design Capacity Software For Helical Anchors And PilesBy Gary L. Seider
Chance, a Division of Hubbell Power Systems, Inc., in conjunction with Sailors Engineering, Inc. has updated its Helical Design Capacity Software. This latest version, ?HeliCAP® v2.0?, is a state-of-
Jan 1, 2007
-
Design Approaches for Externally Supported Earth Retaining Systems – Details and LimitationsBy Matteo Montesi
Deep foundation elements are often used as discrete elements in externally supported earth retaining structures such as soldier piles and lagging walls, secant/tangent pile walls, anchored walls, etc.
Jan 1, 2018
-
Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? SynopsisBy N. V. Nayak
Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i
Jan 1, 1996
-
Accessing HistoryBy Richard Pizzi
Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to
Jan 1, 2011
-
Jet Grout For Soil Mass Stabilisation To Support Power Plant FoundationBy Vishal Pathak, Shailesh A. Godhuly
Ground Modification System in terms of Jet Grouting for soil strengthening and mass stabilization was engaged for a power plant project in an international power project, engineered by L&T-S&L. The si
Sep 1, 2022
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
Diaphragm Walls And Barrettes For Top-Down Construction: A Project ReportBy Bjöm Böhle
Top-down construction (or cut and cover construction) is providing important advantages when comparing with conventional construction techniques for commercial developments with deep basements, underg
Jan 1, 2006
-
Author indexAbouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber
Jan 1, 1994
-
Behavior Of Large Bored Piles With Grouted EndBy Zhang Yaonian
This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati
Jan 1, 2004
-
Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? SynopsisBy Y. G. Qin
In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i
Jan 1, 2010
-
Residual Loads Measurements in Driven Steel H-PilesBy Reda M. Bakeer
"Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results
Jan 1, 2017
-
Session 12 "Deep Mixing Method II"By Helen Ahnberg
The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora
Feb 10, 2003
-
Underpinning A Crane FoundationBy Donald R. McMahon
This paper presents a unique case history that documents the use of a braced secant pile wall to underpin a heavily loaded footing inside of a manufacturing plant. Construction of a pit for a new man
Jan 1, 2006
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In DrivingBy Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
Simplified Model for Increased Lateral Resistance of Deep Foundations Using Soil MixingBy Hubert Law, Dan A. Brown, Kyle M. Rollins
"Soil mixing and jet grouting provide a means to significantly increase the lateral resistance of pile group foundations with relatively little investment of time, effort, and expense compared to the
Jan 1, 2015
-
Ground Improvement Utilizing Vibro Probes Eliminates Liquefaction Concern For A Bridge FoundationBy Aly M. Mohammad
Croton Point Avenue Bridge carries Croton Avenue over Metro-North main tracks at Harmon Rail Yard in Westchester County, New York. The new bridge is 1100 foot long and 36 foot wide nine span structur
Jan 1, 2007
-
Performance Monitoring of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur
There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri
Jan 1, 2019