Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Numerical Analysis Of The Pile-Enhanced Raft Of The Queen Elizabeth II Conference Centre In London, UK

    By Trevor I. Addenbrooke

    Stress reducing piles were used for the first time at the Queen Elizabeth II Conference Centre near the Palace of Westminster in London, UK. The inclusion of these piles directly beneath heavily loade

    Jan 1, 2002

  • DFI
    Numerical Analysis Of The Osterberg Cell Loading Test

    By Brunella Recinto

    Pile loading tests are carried out with two main objectives: 1) evaluating the ultimate resistance; 2) checking the behaviour of the pile under live load. In the first case and particularly for large

    Jan 1, 2003

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • DFI
    The Berkeley Art Museum: Repurposing a Historical Building

    By Timothy Nelson, Simon Burnworth

    "The Berkeley Art Museum and Pacific Film Archive (BAMPFA), which currently resides in a 1970s-era post-modern concrete structure just south of the University of California, Berkeley campus, was in ne

    Jan 1, 2016

  • DFI
    Enhancements To The FHWA Deep Foundation Load Test Database

    By Carl D. Ealy

    Work is being done to web enable the FHWA Deep foundation Load Test Database. Originally designed to function in the client server environment via modem, access to the database both for data maintenan

    Jan 1, 2002

  • DFI
    The Bawang Pile ? A New Type Of Pile ? Synopsis

    By B. Broms

    The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b

    Jan 1, 2010

  • DFI
    Comparative Analysis Between Traditional and EC7 Criteria Applied to the Design of Diaphragm Walls Concerning the Ultimate Limit States

    By J. Matos e Silva

    "Abstract The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditiona

    Jan 1, 2014

  • DFI
    Marine Foundations Of Bridges In The Northeastern USA

    By James S. Graham

    Marine design and construction methods are presented on the caisson foundations for the tower piers at the Brooklyn, Ben Franklin, Delaware Memorial 1st, Tappan Zee, Walt Whitman, Throgs Neck, Verraza

    Jan 1, 2005

  • DFI
    The Value Of Field Measurement In The Design And Construction Of Deep Foundations ? Synopsis

    By J. P. Burland

    The paper describes a number of recent case histories in the United Kingdom where field instrumentation and measurements have played a major role in the design and construction of excavations, piles a

    Jan 1, 2010

  • DFI
    Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting

    By Peter J. Nicholson

    A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th

    Jan 1, 1998

  • DFI
    Constructability Of Tiedback Wall Systems - I. Introduction

    By Thomas C. Anderson

    Tiedback walls are now recognized and accepted as a good solution for a variety of structural problems: ? Retaining Walls and Bridge Abutments in cut situations ? Landslide stabilization ? Rep

    Jan 1, 1991

  • DFI
    The Role Of Real-Time Instrumentation In Large Infrastructure Projects

    By J. G. La Fonta

    The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be

    Jan 1, 2006

  • DFI
    Deep Compaction Of Saturated Loess By Means Of Sand-Gravel Piles ? Synopsis

    By Z. G. Lin

    In Xian, China, compaction by means of soil (or lime-soil) piles is one of the effective methods widely used for densifying loess and eliminating its collapsibility. However, as a result of groundwate

    Jan 1, 2010

  • DFI
    Ultimate Uplift Capacity Of Piles And Pile Groups In Granular Soil

    By B. M. Das

    Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,

    Jan 1, 1989

  • DFI
    Vibrodriving And The Compaction Of Granular Soils

    By RAP Bement

    Installation by vibrodrivers of sheet and bearing piles generates periodic vibrations in the surrounding ground, which have been widely measured and reported. One of the possible consequential effects

    Jan 1, 1996

  • DFI
    Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete Process

    By E. W. Raabe

    The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available

    Jan 1, 1989

  • DFI
    Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge Abutment

    By Samer R. Rabab?ah

    As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)

    Jan 1, 2011

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f

    Jan 1, 2013

  • DFI
    Risk Management and Ground Improvement Technologies in the Case of Liquefaction

    By Sebastian Fischer, Rolf Katzenbach, Steffen Leppla

    "The risk management in the case of liquefaction is one of the most serious and also difficult issues in geotechnical engineering because failure caused by liquefaction is always a sudden failure with

    Jan 1, 2015

  • DFI
    Design And Construction Of The Rion Antirion Bridge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2013