A Study On The Evaluation Of Pile Bearing Capacity Factor And Adhesion Factor In Is 2911By Ashirbad Satapathy, Sanket Rawat, Ramanand Shukla, Ravi Kant Mittal
Bearing capacity factor (Nq) and Adhesion factor (α) are the key parameters for analyzing the load carrying capacity of pile foundations embedded in cohesionless and cohesive soils respectively. Numer
Nov 1, 2022
-
Pin Piles For Seismic Rehabilitation Of BridgesSince the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i
Jan 1, 1993
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont TowerBy Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Ground Water Control In The Urban Environment - IntroductionBy Robert G. Lenz
Control of ground water for construction purposes is an everyday occurrence in the U.S. Thousands of pumps are in service at any given time. Most of these applications simply consist of pumping water
Jan 1, 1988
-
Slope Stabilization of Mill Creek Landslide Using Steel H-PilesBy Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
Commentary on the Selection, Design and Specifcation of Ground Improvement for Mitigation of Earthquake-Induced LiquefactionBy Ground Improvement Committee
The evaluation of earthquake-induced liquefaction has become a routine part of geotechnical engineering design. For a given project, if an analysis identifies a potential for liquefaction and the cons
Aug 1, 2013
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, CanadaBy Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
Man - Organisation - Technology - Proposals For Optimising Preventive WorkBy Walter Ensinger
Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l
Jan 1, 2006
-
Deep Excavation Support – Shangri-La – TorontoBy Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle
"The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe
Jan 1, 2015
-
Piling Adjacent To Rail Tunnels At King’S Cross CentralBy David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
Seismic Considerations for Bridge FoundationsBy Lok M. Sharma
"Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou
Jan 1, 2017
-
Field and Laboratory Mix Trials for a Deep Soil/Cement/Bentonite Cut-Off Wall Using CSM EquipmentBy Russell J. Denny
"A 25m deep cut-off wall is required for environmental remediation of a Former Chlor-Alkali Plant. Extensive trials were conducted to verify the effectiveness of the mixes proposed, with the requireme
Jan 1, 2015
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative SolutionBy Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
Hyperbolic P-Y Model For Static And Cyclic Lateral Loading Derived From Full-Scale Lateral Load Testing In Cemented Loess SoilsBy Steven Dapp
A new hyperbolic model for generating P-Y curves is developed for use in lateral analyses of cemented soils (a ?C-F? soil with both cohesive intercept and friction angle), and includes degradation of
Jan 1, 2011
-
Determination Of Pile Spring In Stratified LayersBy Sandeep Pattnaik
Spring stiffness of soil and rock at different depth is often required for a pile structural model. If the pile is rested in multiple layers of soil, then it is rather more complex to simulate the soi
Nov 1, 2022
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Digitalization in Reverse Circulation Drill RigsBy N. Schmitz
This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem
Sep 8, 2021
-
Hudson’s Revitalization: The Use of Robotics in the Work PlaceBy Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro ProjectBy Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005