High Capacity Micropiles in Weak Dolomitic Limestone for Crane Foundation Support – A Case History in Temporary FoundationsBy Brian D. Barkauskas, Terence P. Holman
A major combined nuclear and coal-fired power plant, located in on the western coast of Florida has undergone multiple upgrades in recent years to increase power output and enhance environmental contr
Jan 1, 2017
-
Design Of Drilled Pier In Expansive SoilsBy G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
Analysis Of Piled Raft Foundation ? SynopsisBy Gandhi
Piled raft foundation under uniformly distributed vertical loads has been analyzed using Finite Element Method. The soil is considered to be linear elastic, isotropic, homogeneous. The raft,pile and t
Jan 1, 1996
-
The Effect Of Drilling Fluid On Axial Capacity, Cape Fear River, NCBy Dan Brown
Two drilled shaft foundations were subjected to axial load tests in order to measure the influence of drilling fluid on performance. Other than the differing drilling fluids, the shafts were construct
Jan 1, 2002
-
Downtown Seattle Transit Project - International District StationBy Richard K. Sandaas
Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th
Jan 1, 1990
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green EnergyBy James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff
Jan 1, 2016
-
Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, CanadaBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B
Jan 1, 2017
-
Value Engineering – Design Risk and Reward at Major Sport Arena ProjectsBy Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli
Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw
Jan 1, 2018
-
Design Of Cooper River Bridge FoundationsBy Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - SummaryBy James S. Graham
Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area
Jan 1, 2000
-
Virginia Route 340 Bridges: Challenges in Karst TerrainBy Chaz Weaver, James Sheahan, Michael Mo
"The Virginia Department of Transportation (VDOT) undertook a program to replace four bridges along approximately 4 mi (6.4 km) of US 340 in Northwest Virginia. Two of these bridges, which span Compto
Jan 1, 2017
-
Installation And Testing Of Instrumented Tieback Anchors - IntroductionBy Joan Stoupa
The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili
Jan 1, 1990
-
Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme GeohazardsBy Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck
"This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium
Jan 1, 2007
-
A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay SoilBy W. Tom Witherspoon
Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric
Jan 1, 2009
-
Reduction Of Local Scour Around Cylindrical Bridge Piers Using Upstream Protective PilesBy A. K. Bhattacharya
Cylindrical bridge piers are widely used and equations exist that can predict the maximum depth of local scour around such piers. Scour around piers is an undesirable phenomenon, as it requires the fo
Jan 1, 2009
-
Inelastic Response Of Extended Pile Shafts In Laterally Spreading Ground During Earthquakes (Student Paper Competition 2010)By Arash Khosravifar
The seismic design of extended pile shafts for the combined effects of dynamic shaking and liquefaction-induced lateral spreading is investigated using nonlinear dynamic finite element analyses (NDA).
Jan 1, 2010
-
Building Drilled Shafts to Bridge the MississippiBy Brian Koch
Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled
Jan 1, 2019
-
Harry Nice Bridge Geotechnical Instrumentation Case StudyBy Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.
Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans
Oct 1, 2022
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
High Capacity Drilled Cast-In-Place Piles, House Of Representatives Building, Lansing, Michigan - SummaryBy Robert C. Rabeler
Soil and Materials Engineers, Inc. (SME) has utilized drilled cast-in-place (D-CIP) piles on a number of projects in the midwest. These foundation systems have typically consisted of drilling an 8 to
Jan 1, 1999