Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Construction And Design Of Drilled Shafts In Hard Pinnacle Limestones

    By Dan A. Brown

    The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos

    Jan 1, 1991

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    The Road To Innovation In Geotechnical Construction

    By Peter J. Nicholson

    During my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concrete or steel i

  • DFI
    A New Method Of Analysis Of Pile Displacement In Soil With Respect To Time

    By M. England

    A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri

    Jan 1, 1993

  • DFI
    CFA Pile Design Parameters in Sand

    By Stuart Coutts

    "This paper presents an overview of the author’s experience related to the assessment of the base capacity of straight shafted and enlarged-base bored piles in sand. A design approach based on CPT qc

    Jan 1, 1900

  • DFI
    An Evaluation Of Augered Cast-In-Place Pile Design Methodolgies For Compression Loading In Sand

    By Giuliana A. Zelada

    This paper reports on a study of 43 compression load tests (five fully instrumented) and ten pullout tests of auger cast-in-place (ACIP) piles in sand. Eight design methods reported in the literature

    Jan 1, 2000

  • DFI
    Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?

    By J. A. Hayes

    For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d

    Jan 1, 2003

  • DFI
    Recent Advances In Soil Nailed Earth Retention

    By Tom A. Armour

    Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&

    Jan 1, 2003

  • DFI
    Anchored Pile Foundations In British Columbia

    By Cory J. E. Yacyshyn

    Anchored steel pipe piles are being used more frequently in British Columbia for shoreline projects such as public ferries, cruise ship docks, containership terminals and locally in the expansion of t

    Jan 1, 2004

  • DFI
    Pile Foundations for the San Francisco 49ers NFL Stadium

    By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi

    "The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7

    Jan 1, 2014

  • DFI
    Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical Soil

    By Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa

    "Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating

    Jan 1, 2014

  • DFI
    Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data

    By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam

    A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice

    Jan 1, 2018

  • DFI
    Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - Introduction

    By Mark X. Haley

    Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven

    Jan 1, 1994

  • DFI
    A Study in Extreme Event Large Displacement Analysis of Large Diameter Piles

    By Bret N. Lingwall, Byron Foster

    The problem of reliable extreme event modeling of large diameter piles under enormous structural or kinematic loads has gained more attention in recent years. In particular, the soil response around t

    Jan 1, 2018

  • DFI
    Session 21 "Grouting in Karst"

    By Jim Henry

    I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi

    Feb 10, 2003

  • DFI
    A New Analysis Of Data From Statnamic Tests On Piles In Clay

    By William F. Anderson

    A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre

    Jan 1, 2006

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • DFI
    A New Method of Quality Control for Construction Joints in Diaphragm Walls

    By Nikolaus Schneider

    "Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta

    Jan 1, 2014

  • DFI
    Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building

    By Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros

    "This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p

    Jan 1, 2016

  • DFI
    The Challenges Of Construction In Karstic Limestone: Three Major Case Histories

    By Donald A. Bruce

    The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si

    Jan 1, 2002