    Using Pile Reinforcement To Mitigate Multimodal Slope Failures: A 3D Lem Case Study

    By Javankhoshdel Yacoub

    Piles are often used to reinforce slopes as they increase the available restoring force when calculating the factor of safety against sliding. In this paper, a 3D model of a slope containing multiple

    Oct 1, 2022

  • DFI
    Effects Of Change In The Support System On Temporary Secant Pile Wall

    By Anburaj C., Srinivas A.

    Deep excavation with support system is required to construct various part of underground structures like shafts, stations and entry structures etc. These structures have to be constructed using perman

    Nov 1, 2022

  • DFI
    DFI Europe Monitoring and Instrumentation Committee Objectives

    By Rob van Dorp

    "AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta

    Jan 1, 2014

  • DFI
    The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)

    By Christian Besson

    This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv

    Jan 1, 2002

  • DFI
    Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall

    By D. A. Bruce

    To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic

    Jan 1, 1989

  • DFI
    Assessment Of The Risk Of Pile Driving To Juvenile Fish - The Problem

    By James J. Anderson

    In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th

    Jan 1, 1990

  • DFI
    A Digital Twin For Deep Vibro Ground Improvement

    By Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter

    This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit

    May 1, 2022

  • DFI
    Risk Assessment and Quality Control on Grouted Waterretaining Layers by Observational Engineering

    By Bartho J. Admiraal

    "As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht River. The A1 consists of 12 lanes and the total width

    Jan 1, 2016

  • DFI
    Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban Slope

    By Mike Fabius

    The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o

    Jan 1, 2006

  • DFI
    Design, Construction and Monitoring of a Secant Pile Compression Ring

    By Jason Weck, Alper Turan, Ali Chehadeh

    "Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro

    Jan 1, 2014

  • DFI
    A Unique Solution To Mitigate Movement At The Jefferson Memorial Seawall

    By Jesús E. Gómez

    In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North

    Jan 1, 2011

  • DFI
    Load Testing Of Steel Sheet Piling Driven With A Vibratory Hammer

    By Drew Floyd

    Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi

    Jan 1, 1989

  • DFI
    Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction

    By Daniel L. Hanson

    This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently

    Jan 1, 1994

  • DFI
    Tentative Guidelines For Design Of Stone Columns- G. H. Approach - Synopsis

    By A. R. Katti

    The stone columns are widely used in the improving the bearing capacity of weak soils mostly for supporting flexible foundation systems. The load carrying capacity of a stone column is complex in natu

    Jan 1, 1996

  • DFI
    The Effect Of Vertical Pile Loading On Subsequent Lateral Behaviour

    By A. Lyndon

    Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically

    Jan 1, 1989

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Pile Foundation - A Critical Study Of Some Design Aspects. - Synopsis

    By S. L. Karunakaran

    Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number

    Jan 1, 1996

  • DFI
    Innovative Non Encroaching Retaining Wall

    By Dino Kartofilis, Rick Deschamps, Giovanni (John) Bonita

    "Anew condominium complex in Arlington, Va., presented some formidable constraints. One was the requirement for a permanent retaining wall to support a 48.5-ft (15-m) cut and an existing 16- story bui

    Jan 1, 2009

  • DFI
    Model Specification Helical Pile Foundations Compression Applications

    "This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider

    Jan 1, 2015

  • DFI
    Realization Of An Innercity Car Park By Means Of A Complex Underpinning Measure

    By Robert Thurner

    The underground car park "Admonterhof in the historical centre of Graz is an example for the technical and economical success of a complicated structural design using a concept on the basis of the obs