Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Trends In Deep Foundations In Europe ? Synopsis

    By R. Stenne

    This paper presents the trends in deep foundations in Europe, both in terms of design and construction. Eurocode 7 which is a design code for geotechnical engineering will be introduced in the Eur

    Jan 1, 2000

  • DFI
    Technical Note - Simplified Settlement Model For A Shallow Foundation On Composite Ground With Rigid Piles

    By Timothy C. Siegel

    A piled raft refers to a shallow foundation that is structurally connected to the piles, while composite ground refers to a soil-pile matrix where the piles are not structurally connected. The design

    Jan 1, 2011

  • DFI
    Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure

    By Damian R. Siebert

    Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation

    Jan 1, 2011

  • DFI
    Bertha Rescue Shaft – SR99 Tunnel

    By Lance Rasband, Richard Hanke

    "Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the

    Jan 1, 2015

  • DFI
    Restoration Of Railway Embankment – A Case Study

    By Prodyot Kumar Ray, Sudip Kumar Koley, Aminul Islam, Somnath Banerjee

    One of the most important topics in the construction industry is the building of railway embankments. Being such a delicate and significant structure, it is crucial to properly design the embankment a

    Sep 1, 2022

  • DFI
    An Introduction to Water-Powered Down-the-Hole Drilling in Specialty Geotechnical Construction

    By Stefan Swartling, Rudy Lyon, Donald A. Bruce

    "Since their first production application in Sweden in 1995, water-powered, down-thehole hammers (WDTH) have been used throughout the world in many different drilling applications, total lines, over 2

    Jan 1, 2015

  • DFI
    Evaluation Of Existing P-Y Models For Caliche Based On Numerical Analysis Of Raiders Stadium Lateral Load Tests

    By Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan

    Numerical lateral load analysis based on the beam on Winkler foundation (BNWF) model (i.e., the p-y method) is a simple, and widely used tool to predict lateral responses of drilled shafts from field

    Oct 1, 2022

  • DFI
  • DFI
    Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998

    By David A. Jack

    The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa

    Jan 1, 1998

  • DFI
    The Analysis Of FEM On The Anchorage Consolidation For Stabilizing A Tunnel With Thick Overburden ? Synopsis

    By J. M. Pei

    In this paper, the nonlinear finite element analysis is used to study the support system of a tunnel which is designed to pass through deep-embeded stratum. The rock mass is rather intact, though a se

    Jan 1, 2010

  • DFI
    Consultants Can Be Safe, Too – A Collaborative Approach

    By Brian FitzPatrick, Michael J. Weaver

    Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration

    Jan 1, 2019

  • DFI
    Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power Facility

    By David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar

    "With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil

    Jan 1, 2016

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • DFI
    Mechanical Characterization of a Chemically Stabilized Soft Soil Reinforced with Fibers When Subjected to Tensile Solicitations

    By J. M. N. P. C. Teles, Venda Oliveira P. J., Correia A. A. S.

    "AbstractA laboratory work was performed to study the mechanical behavior of a Portuguese soft soil chemically stabilized with binders and reinforced with metallic fibers when subjected to tensile str

    Jan 1, 2014

  • DFI
    Interlocking Caisson Walls

    By William E. Lardner

    Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi

    Jan 1, 1987

  • DFI
    A New Approach To Estimate The Base Bearing Capacity Of Driven Piles Based On SPT Data

    By N. Shariatmadari

    In recent years, determining bearing capacity of piles from in-situ testing data as a complement of static and dynamic analysis has been used by geotechnical engineers. In this paper, different approa

    Jan 1, 2006

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • DFI
    Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction Effects

    By Moritz Schleeh, Christian Moormann

    Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s

    May 1, 2022

  • DFI
    Sustainability Considerations in Deep Mixing Applications, With Examples from LPV 111 in New Orleans, LA

    By Craig M. Shillaber, Joseph E. Dove, James K. Mitchell

    "This paper addresses two primary factors affecting the sustainability of Deep Mixing Methods (DMMs): construction materials and handling of the spoil from wet mixing methods. We examine these factors

    Jan 1, 2015

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002