    Sheikh Jaber Al-Ahmad Causeway Project in Kuwait - A Case Study

    By Paolo Cavalcoli, Federico Pagliacci, Marco Chiarabelli

    "The Sheikh Jaber Al-Ahmad Causeway Project in Kuwait is estimated at approximately $US3.7 billion and consists of constructing a causeway across the Kuwait Bay, connecting the Shuwaikh Port with the

    Jan 1, 2016

  • DFI
    Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)

    By Tracy Brettmann

    Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2004

  • DFI
    Secant CFA- Pile Walls - A Risk Management View

    By Mandy Korff

    Walls consisting of CFA-piles are often used for vertical cut offs for building pits. Several methods of installation and geometry may be used and sizes, depths and strengths of walls necessary vary w

    Jan 1, 2006

  • DFI
    Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In China

    By Han Jie

    The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with

    Jan 1, 1991

  • DFI
    You Are Safer In Litigation - I. Prologue

    By Charles F. Seemann

    It is with considerable trepidation that I set out to defend "litigation" to Design Professionals (DPs), as a better method of resolving disputes than arbitration, in the light of my personal feeling

    Jan 1, 1988

  • DFI
    Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA Finalist

    By Bill Shea, Gordon King

    "For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood

    Jan 1, 2012

  • DFI
    Rapid Lateral Load Testing Of Deep Foundations

    By Dan A. Brown

    This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of

    Jan 1, 2007

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • DFI
    A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In Kolkata

    By Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin

    This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1

    Sep 1, 2022

  • DFI
    A Combination of Jet Grouting and MPSP Grouting in Iskar River Cascade Hydropower Plant in Bulgaria

    By Massimo Poggio, Gabriele Balconi, Andrea M. R. Pettinaroli, Mario Ruggiero, Riccardo Castellanza

    Grouting technologies are ground treatment techniques used for modifying the behaviour of a mass of soil or rock by injecting a mixture. The sleeved port pipes (also called Tube A Manchette) are highl

    Jan 1, 2019

  • DFI
    I - 280 / San Francisco Pile Load Test Results And Seismic Design Guidelines - 1. Earthquake Loading Of Structures - A Brief Overview - 1.1 The 1989 Loma Prieta Earthquake - 1.1.1. CSMIP Records - Recorded Time-History Data

    By James A. Mason

    The State of California has instrumented numerous buildings, bridges, and dams throughout the state with earthquake recording devices. These accelerometers are strategically placed to measure the resp

    Jan 1, 1993

  • DFI
    Design Methods For Earthquake-Induced Pile Bending

    By George Mylonakis

    The curvatures and subsequent bending imposed to piles by the surrounding soil during the passage of strong seismic waves is studied. This type of bending develops even in the absence of a superstruct

    Jan 1, 2002

  • DFI
    Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - Synopsis

    By A. R. Jambekar

    City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city

    Jan 1, 1996

  • DFI
    Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load Tests

    By Fawad S. Niazi

    Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf

    Jan 1, 2011

  • DFI
    Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk Zone

    By M. Reza Saberi, T. Ted Miyake

    Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical

    Jan 1, 2018

  • DFI
    Creative Shoring Solutions For A Tight Urban Site

    By David G. Winter

    The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s

    Jan 1, 2009

  • DFI
    Bearing Capacity Of Piles Determined By Field Tests ? Synopsis

    By D. M. Milovic

    On the basis of relatively large number of field load tests of piles, the determination of the ultimate bearing capacity have been studied. Using the load settlement curves and the results of the cone

    Jan 1, 2010

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • DFI
    Dynamic And Static Loading Tests Of Piles For Bridges In Surinam - Introduction

    By W. J. van Niekerk

    Ballast Nedam is in Surinam constructing two bridges that will improve communications in the coastal region. The bridges will cross the Coppenam and Surinam rivers and will be founded on open-ended st

    Jan 1, 2000