Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • DFI
    Numerical Simulation Of Quasi-Static Pile Load Test

    By N. Q. Huy

    This paper describes the application of finite element analysis to simulate the static and quasi-static pile load tests in different drainage conditions. The possible effect of excess pore water press

    Jan 1, 2006

  • DFI
    Evaluation Of Degree Of Overconservatism In Api Shaft Friction Of Piles In Marine Sand Of The Arabian Gulf

    By Ahmed H. Bukhary, Naser A. Al-Shayea

    The objective is to assess the overconservatism in the parameters used for designing offshore piles. Methodology includes analysis of shaft friction data obtained from more than five different locatio

  • DFI
    The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge Piers

    By Leonardo Massone

    The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r

    Jan 1, 2012

  • DFI
    Crane Boom Loadings From Pile Driving

    By Alan G. MacKinnon

    Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s

    Jan 1, 1986

  • DFI
    The Settlements Of Buildings On Pile Foundations

    By Mait Mets

    In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th

    Jan 1, 2002

  • DFI
    Some Experience With Large Diameter Caissons ? Synopsis

    By I. H. Wong

    The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee

    Jan 1, 2010

  • DFI
    Buckling Resistance of Steel Micropiles with Mechanical Splices

    By Fredrik Sarvell, Harald. Ihler, Veli-Matti Uotinen, Jukka Rantala

    "Many of the valid international building codes state that the lateral support provided by the soil is sufficient to prevent buckling of fully embedded piles. However, the development of small diamete

    Jan 1, 2014

  • DFI
    Liquefaction Mitigation Synthesis Report

    By Timothy C. Siegel

    This report presents the results of a synthesis on the design and analysis of ground improvement for liquefaction mitigation. The synthesis included an industry survey concerning the practice of groun

    Aug 1, 2013

  • DFI
    Augered Cast-In-Place Pile Installation, Grand Forks, North Dakota

    By Kyle A. Kershaw

    The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo

    Jan 1, 2003

  • DFI
    Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General Approach

    By L. C. Reese

    ? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc

    Jan 1, 1988

  • DFI
    Evaluation Of The Group Equivalent Pile Approach For Laterally Loaded Shafts

    By Cheng Lin

    The Group Equivalent Pile (GEP) approach was proposed by researchers to analyze a laterally loaded pile group. This approach enables engineers to evaluate the behavior of a pile group in single pile a

    Jan 1, 2009

  • DFI
    Design and Delivery of Micropile Installation Leveraging Augmented and Virtual Reality

    By Guilherme L. M. G. Carvalho, Zachary T. Fleming

    In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser

    Jan 1, 2019

  • DFI
    An Alternative Pile Technology

    By Rimas Veitas, James Panton, Erich Steinlechner

    "Ductile Iron Piles (DIPs) are a proven, viable alternative to conventional piles, and for the past five years have been successfully used throughout New England. The installation process of DIPs lend

    Jan 1, 2017

  • DFI
    Mitigating Settlement with Pile-Supported Approach Slabs

    By Reda M. Bakeer

    "An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t

    Jan 1, 2017

  • DFI
    Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites

    By John P. Davis

    The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s

    Jan 1, 2006

  • DFI
    PVC And Steel Access Tube Debonding During Sonic Logging Testing For The SC 170 Bridge Replacement Project

    By Edward L. Hajduk

    During sonic logging quality control testing of the drilled shaft foundations for the replacement bridges crossing the Broad and Chechessee Rivers for SC 170 in Beaufort County, South Carolina, irregu

    Jan 1, 2004

  • DFI
    List Of Delegates

    AUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,

    Jan 1, 1994

  • DFI
    Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods

    By Derrick D. Dasenbrock

    Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,

    Jan 1, 2006