Design Methods For Earthquake-Induced Pile BendingBy George Mylonakis
The curvatures and subsequent bending imposed to piles by the surrounding soil during the passage of strong seismic waves is studied. This type of bending develops even in the absence of a superstruct
Jan 1, 2002
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)By K. Rainer Massarsch
"Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an
Jan 1, 2004
-
Slurry Trench Design and Construction in Difficult Conditions (5812dfc0-6c6e-4d3d-988d-069d8f606655)By Peter Deming
"PART 1 OF 2INTRODUCTIONSlurry trenches are the least cost hydraulic barrier available, if the excavated spoils can be recycled into backfill. As such, slurry trenches are constructed where possible,
Jan 1, 2006
-
Design, Construction and Monitoring of a Secant Pile Compression RingBy Jason Weck, Alper Turan, Ali Chehadeh
"Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro
Jan 1, 2014
-
DFI Europe Monitoring and Instrumentation Committee ObjectivesBy Rob van Dorp
"AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta
Jan 1, 2014
-
Impact And Ramifications Of Setup For Pile FoundationsBy Cory G. Rice
A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the
Jan 1, 1992
-
Behavior Of Pile Foundation Under Impact Lateral LoadsBy Hajialilue Bonab M.
The soil-pile interaction under lateral impact loads is not yet completely well known. Many tests on single piles under static lateral loads in centrifuge have been performed and P-y curves have been
Jan 1, 2002
-
Axial Pile Response Evaluation By Geophysical Piezocone TestsBy Paul W. Mayne
The axial load-displacement-capacity and load-transfer response of deep foundations can be conveniently assessed by geophysical piezocone tests that provide four independent readings with depth, inclu
Jan 1, 2002
-
Design And Construction Of Drilled Shafts In IraqBy Frederick C. Rhyner
The United States government sponsored the construction of a new vehicular bridge over the Diyala River in Bubriz, Iraq. This paper describes the geotechnical engineering for design and construction
Jan 1, 2009
-
Lateral Load Tests On Drilled Piers In San Diego Area Residual And Formational SoilsBy Kul Bhushan
This paper presents the results of lateral load tests on 0.61-m to 1.27-m (24 to 50-inch) diameter drilled and cast-in-place piers in San Diego area residual/formational soils. The test piers were ins
Jan 1, 2002
-
2D and 3D Finite Element Analysis for Cantilever Slurry Walls in Cohesionless SoilBy Mostafa Mossaad, Ali Helwa, Manal Salem
Support of excavation (SOE) design practice tends to model SOE elements using two-dimensional (2D) analyses to avoid the complexity associated with three-dimensional (3D) analyses. Such practice overl
Jan 1, 2018
-
Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk ZoneBy M. Reza Saberi, T. Ted Miyake
Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical
Jan 1, 2018
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual RealityBy Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
Foundations Settlement Estimation by Non-Linear Stress-Strain Approach Using CPT RecordsBy Abolfazl Eslami, Fatemeh Valikhah
"Complexity in soil-foundation interaction and subsoil nonlinear behavior cause difficulties and uncertainties in evaluating the actual values of foundation design factors such as settlement. The acqu
Jan 1, 2017
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole InspectionBy Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
Working Platforms In Geotechnical Jobs: Recommendations For Execution And MaintenanceBy Gustavo Armijo
Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha
Jan 1, 2006
-
Alignment Control Of Drilling Rods For Jet Grouting By Integrated MicrochipsBy Mousaab Majar, Nikolaus Schneider
The technical challenges for accurate drilling positions increase with deep underground structures in inner city areas. Designed for jet grouting, specific sensors have been developed to record the al
May 1, 2022
-
Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scandinavian Development ProjectsBy K. Viking
This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and
Jan 1, 2013
-
Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)By George Piscsalko
Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,