Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    One Liberty Place, at 315 m is the tallest building in Philadelphia, PA USA. It is supported on drilled piers socketed in heterogeneous rock. 3832 kN/m2 end bearing and 383 to 766 kN/m2 shaft resistan

    Jan 1, 1989

  • DFI
    Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction

    By Anthony H. Tawil

    Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte

    Jan 1, 1987

  • DFI
    Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons Learnt

    By Ziyad Abunada, David O’Connor, Abir Al-Tabbaa

    "Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental

    Jan 1, 2014

  • DFI
    Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled Shafts

    By Josef K. Alter

    Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr

    Jan 1, 2011

  • DFI
    Predicting ACIP Pile Settlement Using Case Histories ? Introduction

    By Christopher M. Kenney

    Augered-cast-in-place (ACIP) piles have been utilized on commercial projects throughout many parts of the country for years, but are only beginning to be scrutinized for use on major infrastructure pr

    Jan 1, 2001

  • DFI
    Foundations For Arsenal Emirates Stadium, London

    By Jim Cook

    Arsenal Football Club required the development of a new home stadium in north London, subsequently named the Emirates Stadium. The proposed development comprised a 60,000 seat stadium, with associated

    Jan 1, 2008

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles

    By Garland Likins

    High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o

    Jan 1, 2000

  • DFI
    Characterization Of Loess For Deep Foundations

    By Robert L. Parsons

    This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet

    Jan 1, 2009

  • DFI
    Deep Excavations And Foundations For Locks ? Synopsis

    By B. H. Moore

    Foundation and excavation problems associated with lock construction projects vary widely. Each lock requires a different foundation to respond to a unique geologic setting. The range of heights and f

    Jan 1, 2010

  • DFI
    Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? Introduction

    By D. Arentsen

    Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin

    Jan 1, 1987

  • DFI
    Practical Experience With Nondestructive Testing Of Augered Cast-In-Place Piles

    By Bernard H. Hertlein

    All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug

    Jan 1, 1997

  • DFI
    Identification and Quantification of Pile Relaxation

    By Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam

    Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of

    Jan 1, 2019

  • DFI
    Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest Florida

    By Gregory A. Stephan

    A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi

    Jan 1, 1999

  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007

  • DFI
    Excavation-Induced Movement of Adjacent Foundations

    By Hugo Meggitt, Damian R. Siebert, Wystan Carswell

    Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras

    Jan 1, 2019

  • DFI
    Seismic Design Of Micropile Foundation Systems

    By Leo Panian

    Over the last decade, drilled and post-grouted micropile foundations have come to be increasingly relied upon for resisting seismic loads in building foundations on the West Coast. Micropiles have bee

    Jan 1, 2010

  • DFI
    Cost Effective Drilling Of Extra Large [XL] Monopile Foundations

    By Phil Wilkinson, Sam Whitaker

    "The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo

    Jan 1, 2017

  • DFI
    Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case Study

    By Parameswaran V. S, Anshuman Singh

    This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v

    Nov 1, 2022

  • DFI
    Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - Synopsis

    By Anupam Saxena

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U

    Jan 1, 1996

  • DFI
    Insitu Ground Reinforcement Techniques

    By Peter J. Nicholson

    The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement

    Jan 1, 1991