Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Session 19 "Compensation Grouting"By Douglas Heenan
The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time
Feb 10, 2003
-
Geotechnical Assessment Of Highly Saline Soil Stabilized With Fly Ash - Cement AdmixturesBy Jahnavi Parmar, Pranav R. T Peddinti, Saloni Pandya, P. S. Prasad
Coastal cities are in desperate need of suitable land to meet the ever-increasing demand for urban infrastructure to support commercial, residential, tourism, and off-shore activities. Countries with
Sep 1, 2022
-
Alternative Binder For Ground Improvement To Reduce Co2 FootprintBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
The Sandbukta-Moss-Såstad (SMS) project is a part of the Intercity development project, which is part of the largest transport project in Norway, consisting of 270 km of new double-track rail. The SMS
May 1, 2022
-
Increase In Shear Modulus By Soil Mix And Jet Grout MethodsBy Paul J. Axtell
The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc
Jan 1, 2008
-
Design And Application Of Vertical Micropiles To Resist Large Lateral LoadsBy Helen D. Robinson
Traditional practice to resist large lateral loads on foundations is the use of large diameter caissons, battered driven piles, or battered micropiles. Dense urban construction environments, however,
Jan 1, 2010
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case StudyBy James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved ClayBy Carl Ealy
Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m
Jan 1, 2002
-
Helical Foundations And Tiebacks: Quality Control, Inspection And Performance MonitoringBy John S. Pack
The last 25 years have seen rapid expansion in the use of helical screw pile foundations and tiebacks for new and retrofit construction of buildings and earth retention structures. An estimated $100 m
Jan 1, 2003
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case StudyBy Krishnendu Mandal
"For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile
Jan 1, 2015
-
Present To Future Design Considerations Of Deep Foundations ? 1. IntroductionBy William S. Gardner
It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac
Jan 1, 1991
-
Structural Underpinning By PinpilesBy D. A. Bruce
Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per
Jan 1, 1992
-
Jet Grouting As Soil Improvement In Southeast FloridaBy Evelio N. Horta
The influence of soil improvement replacement area in foundation settlements is discussed for soil improvement methods used in Southeast Florida. A 3D Finite element analysis is used for two typical c
Jan 1, 2007
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test ResultsBy Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
Comparison Of Static Pile Analyses And Load Test ResultsBy Alan B. Wagner
Data from seven instrumented pile load tests in Milwaukee, Wisconsin and two other instrumented load tests reported in the literature, one in Evanston, Illinois and one in Houston, Texas were reviewed
Jan 1, 1991
-
Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static MethodsBy Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro ClayBy Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong
"Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al
Jan 1, 2017