Foundations For The M25 Motorway Near To Heathrow AirportBy John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
Modern Procedures For The Design Of Driven Pile FoundationsBy G. G. Goble
Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength
Jan 1, 1988
-
The Use Of Spin Fin® Piles In MassachusettsBy Les R. Chernauskas
Driven pipe piles are commonly used for near and offshore structures due to their omni-directional bending resistance, large surface area, and ease of installation. However, these piles typically cann
Jan 1, 2011
-
Biodegradable Hydraulic Fluid in the Deep Foundation Industry - SynopsisBy S. H. Miller
Biodegradable hydraulic fluids can save tens or hundreds of thousands of dollars in fines and clean up costs in the event of a hydraulic fluid leak or spill. When properly selected, applied, maintaine
Jan 1, 2000
-
Marine Foundation Retrofit For The Richmond - San Rafael BridgeBy Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez BridgeBy Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma
Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t
Jan 1, 2005
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical SoilBy Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa
"Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating
Jan 1, 2014
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group TechnologyBy Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014
-
Resonant Pile Driving - Part I - The Promise & The Reality - Part II - Soldier Pile Installation - Light Rail Transit - Buffalo, New York - 1. Historic Background.By D. R. Dance
The Resonant, or as it has more commonly come to be known the 'Sonic' Pile Driver, dates back to the early 1960's, when prototypes were produced by Charlie Guild, of Providence, Rhode I
Jan 1, 1987
-
Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoireBy Adrian Mercer, Ashkan Ameri
Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi
Sep 8, 2021
-
A Fully Connected Jobsite is a Must for the FutureBy Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons LearnedBy Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Evaluating Efficiency of Geo5 in the Analysis of Pile FoundationBy Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal
"Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail
Jan 1, 2017
-
Real Time Monitoring the Historic Old South Church, Boston, MassachusettsBy Pierre Gouvin, Michael Oakland
"This paper covers the rapid response methods used to monitor the emergency response to damage to an historic structure. An architectural gem, the latest incarnation of the old south Church was comple
Jan 1, 2017
-
The Effc/Dfi Guide To Support Fluids For Deep FoundationsBy Chris Harnan, Christophe Justino
The European Federation of Foundation Contractors (EFFC) and the Deep Foundations Institute (DFI) jointly published Edition 1 of the ‘EFFC/DFI Guide to Support Fluids for Deep Foundations’ in April 20
May 1, 2022
-
Tension Testing of the Grouted Anchorage Assembly for Multistrand AnchorsBy Lucian L. Bogdan
"SummaryActive loaded strand anchors are often used for slope stabilization, retaining walls or tiedown anchors. Normally, strands are tensioned against the structure and wedges are locked inside the
Jan 1, 2005
-
Vibration Isolation at the Dana-Farber Yawkey Center: OPA FinalistBy David R. Shields, Michael T. Bracher
"The $330 million (U.S.) Dana-Farber Cancer Institute’s Yawkey Center for Cancer Care (Yawkey Center) sits in the heart of Boston’s Longwood Medical Area. The Yawkey Center is a cutting-edge cancer ca
Jan 1, 2012
-
Rock Socket Capacity Certification Using the Point Load Index TestBy Burt G. Look, David W. Lacey
"Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde
Jan 1, 1900
-
Marine Prefabricated Vertical Drains For The Craney Island Eastward ExpansionBy Ira Brotman
The Virginia Port Authority and the U.S. Army Corps of Engineers are partnering to construct the Craney Island Eastward Expansion (CIEE) to meet the dual purpose of extending the life of Craney Island