Non-Linear Analysis Of Laterally Loaded Piles: Calibration Of A New MethodBy Vasileios A. Drosos
The response of pile foundations to lateral loads is an important factor for the successful performance of several critical structures. A new numerical code for the analysis of single piles under late
Jan 1, 2006
-
Session 32 "Grout Mixtures and Materials 3"By Lois G. Schwarz
I did a project (Sungai Piah) as a consultant to your firm in Malaysia, where we were faced with a similar situation as sketched out in your question. The following is what we did for the grouting of
Feb 10, 2003
-
A Digital Twin For Deep Vibro Ground ImprovementBy Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter
This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit
May 1, 2022
-
Design And Performance Evaluation Of A Grouting Program In Weak Rock MassesBy George Moses K, Mahendran K
Grouting is performed in rock masses in order to increase its strength properties and also to reduce the seepage. In the design of underground structures such as tunnels or caverns located in weak roc
Nov 1, 2022
-
Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in ClayBy Kjell Karlsrud
"Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o
Jan 1, 2014
-
A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty GroundBy H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi
"In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe
Jan 1, 2015
-
LRFD and Its Implications for QC/QA of Deep FoundationsBy Bernard Hertlein, Chia K. Tan
"The move to LRFD methods for structural design by AASHTO, ACI, AISC , ASCE, and the FHWA has been a major change for the American construction industry. The deep foundations industry has arguably bee
Jan 1, 2005
-
Rehabilitation of U.S. 70 Bridge over Lake HamiltonBy Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)By Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Foundation Contracts And Law - Part -1: Relevan[i] LawBy Kirty Dave
Foundations in any contract are the most uncertain parts of the contract and most of the "Construction-Contract-Disputes" are either directly related to foundations or arise as 'Side-effects of c
Jan 1, 1996
-
Toe Protection For H-Piles On Sloping Bedrock At Rainy River - SummaryBy Jon E. Bischoff
Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi
Jan 1, 1993
-
CFA Pile Design Parameters in SandBy Stuart Coutts
"This paper presents an overview of the author’s experience related to the assessment of the base capacity of straight shafted and enlarged-base bored piles in sand. A design approach based on CPT qc
Jan 1, 1900
-
A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete PileBy K. Viking
It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered
Jan 1, 2004
-
Alternative Deep Foundation Solutions ? Dmm At Lpv-111 In New OrleansBy Wesley Schmutzler
The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t
-
Deep Foundations on Buildings using Driven Ductile Iron Micropiles.By Antonio A. Cristóvão, Alexandre Pinto
"Abstract Deep foundations of buildings using driven ductile iron micropiles TRIM solutions, leads to recognized advantages, from technical, schedule and economic points of view. High production rate
Jan 1, 2014
-
Peak And Post-Peak Shear Strength Of Cement-BentoniteBy Paul J. Axtell
Self-hardening cement-bentontie (c-b) slurry walls were constructed as shear walls to stabilize the downstream slope of Tuttle Creek Dam near Manhattan, Kansas. The slope stabilization was required t
Jan 1, 2010
-
Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On PilesBy Nien-Yin Chang
The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution
Jan 1, 2007
-
Cockatoo Island Seawall Seepage Barrier – Permeation Grouting, Jet Grouting and a Soil/Cement/Bentonite Mixed Slurry Capping TrenchBy Chris L. Powell, Russell J. Denny.
"The remotely located Cockatoo Island iron ore mine off the Kimberly coast in Western Australia, which has been in operation since 1951, was recently expanded up to 50m below sea-level using staged co
Jan 1, 2016
-
Army Corps Mega Projects Benefits From Innovative FoundationsBy Dale Berner, Michael O’Sullivan
"This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr
Jan 1, 2017
-
Monitoring Auger Cast in Place Pile Construction and Testing in Hard Clay (c1a730a8-7e87-4cd7-85b2-336e4f7995da)By Onur Guvener, Kalaiarasi Vembu, C. Vipulanandan
"Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curin
Jan 1, 2017