Wadi Dayqah Dam CurtainBy Frank Haehnig, Harald Krenn, Harm-Christoph Claassen
"The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the
Jan 1, 2016
-
Thermo-Mechanical Behavior of Energy Piles: Full-Scale Field Test VerificationBy Tracy Brettmann, Melis Sutman, C. Guney Olgen
"The use of energy piles for geothermal heat exchange has been steadily increasing during the last decade, yet there are still pending questions on their behavior during temperature changes. This pape
Jan 1, 2017
-
Use of APG Piles for Support of New Hospital Replacement Wing in a Site Susceptible to Excessive Ground Settlement Ventura, CaliforniaBy Maria Flessas, Justin Ray, Danielle Steinmetz, Brian Zuckerman
"The Ventura County Medical Center Hospital Replacement Wing project consists of the construction of a 2- to 3-story building with a basement encompassing the entire footprint and two corridors connec
Jan 1, 2016
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Installation And Testing Of Instrumented Tieback Anchors - IntroductionBy Joan Stoupa
The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili
Jan 1, 1990
-
Jardim de Alah Station — Built in Olympic TimeBy Dario Libano, Luis Carlos Tenuta, Juliano Penteado
"Subway Line Number 4 is one of the newest additions to the Rio de Janeiro subway network. Built for the 2016 Olympic Games, the 16 km (10 mi) subway line connects the south of the city, with the famo
Jan 1, 2016
-
Augered Cast-In-Place Pile Installation, Grand Forks, North DakotaBy Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
Repairs Of Diaphragm Walls, Lessons LearnedBy Raymond J. Poletto
This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal
Jan 1, 2011
-
Dynamic Testing Results Indicator Pile Test Program --I-880 - IntroductionBy D. Michael Holloway
The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-
Jan 1, 1995
-
Concrete Overbreak Estimation and Analysis Errors in Bored PilesBy Nuno Cruz
"The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before
Jan 1, 2017
-
Design Parameter For Jacked PileBy Sugie Prawono
Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr
Jan 1, 1999
-
Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Limited Access Underpinning And Re-Leveling Of A Six-Story Office Building Using Jet Grouted MicropilesBy Tom Szynakiewicz
Micropiles are routinely used in the United States for foundation support and underpinning applications. The high capacities achievable with the use of micropiles, combined with specialty rigs for ea
Jan 1, 2008
-
Pile Settlement Design Using Continuous Surface Wave Testing And Modulus DegradationBy Hennie F. T. Barnard
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
-
Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban SlopeBy Mike Fabius
The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o
Jan 1, 2006
-
Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment DescriptionBy Jean J. Abiassi
The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t
Jan 1, 1994
-
Use Of Anchors In Floors Of Large Drydocks And Wagon Tipper Sheds ? SynopsisBy W. H. Liu
The stability of floors of large drydocks and wagon tipper sheds at coal terminals is an important matter but quite difficult to solve. Anchors can be used to join floors to foundations thus ensuring
Jan 1, 2010