Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground ConditionsBy Emad Farouz
This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan
-
“Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down MethodBy Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi
"The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,
Jan 1, 2016
-
Deep Foundation Construction Using "Top/Down" Building Techniques In The United StatesBy David C. Lager
While not a new construction technique "top/down" construction is seeing increased use in high rise building construction. Using diaphragm wall, drilled shaft and mining construction techniques, top/d
Jan 1, 1987
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case StudyBy Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu
Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi
Nov 1, 2022
-
Seismic Behavior of Full-Scale Piles in Improved Soft Clay (8135d170-323f-4789-8067-7d5f00fd5bb8)By Jin-Wei Huang, Bradley J. Fleming, Sri Sritharan
"Although soil improvement and its application to deep foundations is gaining popularity in the engineering community, this technique is not widely used in high seismic regions due to lack of fundamen
Jan 1, 2017
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And ConstructionBy David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site CharacterizationBy Anahita Modiriasari, Benjamin S. Rivers
Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca
Oct 1, 2022
-
Oldie But Goldie – Bi-Directionally Tested Foundation Piles With Base Enlargement As A Smart And Economical Alternative To Conventional Piles At Geneva, SwitzerlandBy Dipl. -Ing. (FH) Thomas Schmitt, Dr. Melvin England
Foundations in Geneva are difficult and expensive due a large overlayer of clay and silt above competent bearing material in the moraine. Common foundation schemes use deep barrettes or bored piles, f
May 1, 2022
-
Vertical Bearing Capacity of Pile Installed by "EX MEGATOP" Method - Base Enlarged Pre-boring and Grouting Method for Pre-cast PileBy Hitoshi Ogura, Koichi Kobayashi, Sadao Yabuuchi
"In Japan, most pile foundations using pre-cast concrete piles are installed by the bored pre-cast piling method, wherein pre-cast piles are installed in holes that have been excavated beforehand and
Jan 1, 2005
-
Design-Build Synergy To Deliver Pile FoundationsBy David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing FacilityBy Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler
"This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in
Jan 1, 2015
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling MethodBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019
-
Foundation Rehabilitation of the Henry Hudson BridgeBy Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel
Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe
Sep 8, 2021
-
Dyna Force Sensors for Monitoring of Tension/Compression Forces in Ground Anchors & PilesBy Shahid Islam, Lucian Bogdan
"The maintenance of infrastructures has been of particular concern to the engineering community. As the world’s infrastructure expands and existing infrastructure ages, monitoring and evaluation of th
Jan 1, 2017
-
Estimation & Comparison Of Axial Compression Capacity Of Bored Cast In-Situ Piles As Per Indian And International StandardsBy Sowmiyaa. V. S., Tiruvengala Padma
Axial compression capacities of bored cast in situ piles as per Indian and International Standards are compared in this paper. Bored cast in-situ piles resting on soil and rock are considered for capa
Sep 1, 2022
-
ACIP Pile Performance and Installation in the Northeastern United StatesBy Jr NeSmith
"Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile
Jan 1, 2016
-
Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase IiBy Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.
The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris
Nov 1, 2022
-
Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)By Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in
May 11, 2007
-
Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering GuidelinesBy M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
Determination of Liquefaction in Time Domain Using Shake Table Test, Wavelet Analysis and Numerical ApproachBy Aniruddha Sengupta, Rana Chattaraj, G. R. Reddy, Raj Banerjee
"Earthquake induced liquefaction in saturated granular soils is an important phenomenon which causes severe damage to life and property. In the present study, dynamically induced liquefaction of satur
Jan 1, 2015