Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
FHWA Hollow Bar Soil Nail (HBSN) Test Program, A SummaryBy Jesús E. Gómez
Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p
Jan 1, 2011
-
Non-Braced And Non-Anchored Diaphragm Walling In Soft Soil ? SynopsisBy D. Y. Peng
A Large Sub-structure with open top of S.Y.P. float line requires a 90m x 50m in plan and 13m-deep excavation in soft soil, Shanghai. The geological conditions in site are rather severe. The technolog
Jan 1, 2010
-
Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? IntroductionBy D. Arentsen
Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin
Jan 1, 1987
-
General Report - Deep Excavations "He Who Pays The Piper Calls The Tune"By Tim Chapman
This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f
Jan 1, 2006
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Mitigating Settlement with Pile-Supported Approach SlabsBy Reda M. Bakeer
"An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t
Jan 1, 2017
-
Monitoring Auger Cast in Place Pile Construction and Testing in Hard Clay (c1a730a8-7e87-4cd7-85b2-336e4f7995da)By Onur Guvener, Kalaiarasi Vembu, C. Vipulanandan
"Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curin
Jan 1, 2017
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Interstate 70 Construction Through Glenwood Canyon, Colorado - Glenwood Canyon ConstructionBy Ray Schmahl
The Glenwood Canyon is a 13 mile long river gorge formed by the Colorado River approximately 2 miles East of Glenwood Springs, Colorado and approximately 150 miles West of Denver Colorado, (See Drawin
Jan 1, 1990
-
Using Seismic Tomography To Evaluate Foundation StructuresBy Ed Kase
Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit
Jan 1, 2003
-
Geotechnical Exploration Phase Drilled Shaft Load TestingBy Walter E. Vanderpool
Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and
Jan 1, 2011
-
A Geotechnical Instrumentation Case StudyBy Mehih Demirkan, Kevin Tehansky
Located about an hour drive south from Washington, D.C., the Maryland Transportation Authority (MDTA) contracted with Skanska-Corman-McLean (SCM) to deliver a new Governor Harry W. Nice Memorial/Senat
Apr 1, 2023
-
Unique Foundation Solution For The Shriners Burns Institute Building Expansion - I. IntroductionBy Edmund Cardoza
In the spring of 1993, construction began on an ambitious building project in Boston, Massachusetts. The Shriners organization committed to offer state-of-the-art adolescent burn treatment and rehabil
Jan 1, 1994
-
Monitoring Auger Cast In Place Pile Construction And Testing In Hard ClayBy C. Vipulanandan
Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green EnergyBy James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff
Jan 1, 2016
-
Realizing The Benefits Of LRFD For Deep FoundationsBy Bernard H. Hertlein
The introduction of LRFD methods for structural design has been a gradual process by AASHTO, ACI, AISC, ASCE, and the FHWA, which has largely been ignored by the deep foundations industry. In 2007, ho
Jan 1, 2007
-
Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble DepositsBy Marco Fellin, Van E. Komurka
Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.
Jan 1, 2019
-
Load And Resistance Factor Design Of Pullout Of A Single Driven Pile In Sands And ClaysBy Dongwook Kim
Recently, load and resistance factor design (LRFD) is gradually being adopted internationally in geotechnical design due to the advantages of LRFD over the existing allowable stress design (ASD). LRFD
Jan 1, 2010
-
-
Roger Bullivant Cone PileBy R. A. Bullivant
Roger Bullivant Piling Limited has started 1992 with the introduction of the CONE PILE into its range of precast concrete foundation techniques. Since the establishment of its Piling Division ten
Jan 1, 1992