Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - Summary

    By Basem Sh. Hazzan

    In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on

    Jan 1, 1999

  • DFI
    Converse Probabilistic Analysis And Testing In Situ For Bed Rock Under Pile With Large Diameter

    By Peng Jiahong

    With ultrasonics application during checking the large diameter cast-in-situ pile body, it is usualy applied the statistical method of probability and PSD. This paper presents a converse probabilistic

    Jan 1, 1991

  • DFI
    Recent Experience With The Omega Pile And New Applications - Synopsis

    By Maurice Bottiau

    The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the

    Jan 1, 1996

  • DFI
    A New Method Of Analysis Of Pile Displacement In Soil With Respect To Time

    By M. England

    A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri

    Jan 1, 1993

  • DFI
    A Critical Appraisal Of Is-Code Provisions For Pile Design ? Synopsis

    By N. Som

    The pile capacity in cohesive and granular soils depends on a number of parameters. The values of these parameters as recommended by Indian Standard Code of Practice vary over wide ranges. A designer

    Jan 1, 1996

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • DFI
    Interpreted Residual Load In An Augered Cast-In-Place Pile

    By Timothy C. Siegel

    Accurate representation of the geotechnical resistance distribution is critical in evaluating the performance of piles and pile groups for design. A current practice is to infer the geotechnical resi

    Jan 1, 2009

  • DFI
    Design and Installation of Gudrun Platform Jacket Piles

    By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr

    "Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall

    Jan 1, 2014

  • DFI
    Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction

    By Nino Catalano

    The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso

    Jan 1, 1994

  • DFI
    A Case Study Of Passive Piles Failure In Open Excavation

    By S. T. Kok

    This paper presents a case study in West Malaysia for passive piles failure in very soft marine clay in open excavation. In this particular case, the thickness of the very soft marine clay ranges from

    Jan 1, 2009

  • DFI
    Berminghammer II 25 Vertical Travel Lead System: Innovative Technology For Deep Foundation Soil Mixing - 0.0 Introduction

    By Andy Schroeder

    Located in Hamilton, Ontario Canada, Berminghammer Foundation Equipment, is a manufacturer of advanced foundation equipment with 30 years of experience. The company is represented in more than 20 coun

    Jan 1, 1997

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :

    By Virendra Singh

    The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic

    Jan 1, 1996

  • DFI
    A Comparative Study on Behavior of Bucket Pile in Sand According to Installation Methods

    By Jinung Do, Sung-Ryul Kim, Juhyung Lee

    "Model tests have been performed to investigate the vertical, horizontal and cone tip resistances of bucket pile embedded in sand by different installation methods; suction force by pump and jacking f

    Jan 1, 2016

  • DFI
    Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? Introduction

    By Robert A. Field

    Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S

    Jan 1, 1995

  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • DFI
    Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction

    By Peter Florian

    At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning

    Jan 1, 1993

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)

    By Frank Rausche

    The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender

    Jan 1, 2001

  • DFI
    Approximate Assessment Of Basement Wall Effects On Foundation Performance

    By Helen S. W. Chow, Harry G. Poulos

    Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl

    Nov 1, 2022